IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,865

matching recommendations
Reset
SIC 28 Chemicals And Allied Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UMS007 # 02 Y:2012 02 2012 RECOVER WASTE HEAT FROM EQUIPMENT $480,000 $800,000 Implemented
MI0218 # 03 Y:2012 03 2012 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $53,118 $2,520 Implemented
MI0218 # 05 Y:2012 05 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $21,901 $1,660 Implemented
MI0218 # 08 Y:2012 08 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $10,055 $80 Implemented
AM0606 # 03 Y:2012 03 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $900 $3,110 Implemented
DL0082 # 03 Y:2012 03 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,641 $1,330 Implemented
DL0082 # 04 Y:2012 04 2012 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $716 $90 Implemented
MA0688 # 02 Y:2012 02 2012 INSTALL / REPAIR INSULATION ON STEAM LINES $10,004 $9,352 Implemented
MA0688 # 03 Y:2012 03 2012 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $2,644 $2,250 Implemented
MA0688 # 06 Y:2012 06 2012 INSTALL OCCUPANCY SENSORS $1,689 $4,605 Implemented
UA3017 # 01 Y:2011 01 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $25,000 $10,000 Implemented
UF0451 # 01 Y:2011 01 2011 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,739 $0 Implemented
UF0451 # 02 Y:2011 02 2011 INSTALL COMMON HEADER ON COMPRESSORS $8,773 $222 Implemented
UF0451 # 04 Y:2011 04 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,153 $1,277 Implemented
UF0451 # 05 Y:2011 05 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,440 $3,310 Implemented
UF0451 # 06 Y:2011 06 2011 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $498 $0 Implemented
UF0449 # 01 Y:2011 01 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $493 $0 Implemented
UF0449 # 03 Y:2011 03 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $853 $482 Implemented
UF0449 # 05 Y:2011 05 2011 INSTALL OCCUPANCY SENSORS $1,884 $1,676 Implemented
UF0449 # 06 Y:2011 06 2011 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $697 $0 Implemented
UF0449 # 09 Y:2011 09 2011 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $659 $686 Implemented
UF0449 # 10 Y:2011 10 2011 AIR CONDITION ONLY SPACE NECESSARY $227 $21 Implemented
NC0438 # 02 Y:2011 02 2011 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $8,972 $7,800 Implemented
NC0438 # 07 Y:2011 07 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,224 $300 Implemented
NC0438 # 08 Y:2011 08 2011 INSTALL OCCUPANCY SENSORS $1,416 $2,112 Implemented