IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,870

matching recommendations
Reset
SIC 28 Chemicals And Allied Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0569 # 05 Y:2005 05 2005 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $2,040 $1,980 Implemented
CO0569 # 08 Y:2005 08 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,770 $3,520 Implemented
CO0569 # 09 Y:2005 09 2005 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,600 $1,980 Implemented
CO0569 # 11 Y:2005 11 2005 INSTALL OCCUPANCY SENSORS $560 $710 Implemented
UF0364 # 01 Y:2005 01 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,914 $406 Implemented
UF0364 # 02 Y:2005 02 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,126 $19,754 Implemented
UF0364 # 05 Y:2005 05 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $754 $0 Implemented
LE0215 # 01 Y:2005 01 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $99,127 $115,500 Implemented
LE0215 # 04 Y:2005 04 2005 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $8,220 $1,588 Implemented
IC0105 # 01 Y:2005 01 2005 INSTALL / REPAIR INSULATION ON STEAM LINES $60,808 $100,000 Implemented
IC0105 # 02 Y:2005 02 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $7,211 $2,000 Implemented
IC0105 # 03 Y:2005 03 2005 REPAIR AND ELIMINATE STEAM LEAKS $17,271 $3,900 Implemented
MI0107 # 03 Y:2005 03 2005 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,525 $100 Implemented
MI0107 # 04 Y:2005 04 2005 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $4,012 $4,012 Implemented
MI0107 # 05 Y:2005 05 2005 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,325 $42 Implemented
MI0107 # 06 Y:2005 06 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,128 $0 Implemented
OK0710 # 02 Y:2005 02 2005 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,475 $3,550 Implemented
OK0710 # 05 Y:2005 05 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,439 $4,746 Implemented
OK0709 # 02 Y:2005 02 2005 INSULATE BARE EQUIPMENT $3,684 $1,030 Implemented
MS0273 # 03 Y:2005 03 2005 REPAIR AND ELIMINATE STEAM LEAKS $7,498 $89 Implemented
MS0273 # 07 Y:2005 07 2005 PAY UTILITY BILLS ON TIME $3,704 $0 Implemented
MS0273 # 12 Y:2005 12 2005 INSTALL TIMERS AND/OR THERMOSTATS $261 $204 Implemented
LM0095 # 01 Y:2005 01 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $93,378 $1,200 Implemented
LM0095 # 02 Y:2005 02 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,900 $2,262 Implemented
LM0095 # 03 Y:2005 03 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,871 $750 Implemented