IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

111

matching recommendations
Reset
SIC 28 Chemicals And Allied Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0718 # 04 Y:2016 04 2016 USE SYNTHETIC LUBRICANT $28,832 $0 Implemented
MA0762 # 02 Y:2016 02 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $65,741 $161,899 Implemented
MA0762 # 06 Y:2016 06 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,640 $13,585 Implemented
MA0762 # 05 Y:2016 05 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $47,587 $19,980 Implemented
MA0762 # 03 Y:2016 03 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $52,257 $19,975 Implemented
MA0762 # 04 Y:2016 04 2016 RECOVER WASTE HEAT FROM EQUIPMENT $49,046 $65,000 Implemented
WV0535 # 09 Y:2016 09 2016 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $320 $298 Implemented
WV0535 # 08 Y:2016 08 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $691 $30 Implemented
WV0535 # 07 Y:2016 07 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,622 $2,120 Implemented
WV0535 # 06 Y:2016 06 2016 DEVELOP A REPAIR/REPLACE POLICY $1,538 $578 Implemented
WV0535 # 03 Y:2016 03 2016 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $3,206 $1,000 Implemented
WV0535 # 02 Y:2016 02 2016 INSULATE BARE EQUIPMENT $4,153 $511 Implemented
WV0535 # 10 Y:2016 10 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $260 $138 Implemented
NC0574 # 01 Y:2016 01 2016 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $138,968 $500 Implemented
NC0574 # 08 Y:2016 08 2016 INSTALL OCCUPANCY SENSORS $63 $50 Implemented
NC0574 # 06 Y:2016 06 2016 USE PHOTOCELL CONTROLS $1,303 $150 Implemented
NC0574 # 07 Y:2016 07 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,150 $5,360 Implemented
SD0537 # 05 Y:2016 05 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,406 $10,314 Implemented
SD0537 # 09 Y:2016 09 2016 INSTALL OCCUPANCY SENSORS $1,312 $3,610 Implemented
MI0300 # 13 Y:2016 13 2016 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $5,924 $40 Implemented
MI0300 # 02 Y:2016 02 2016 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $96,255 $386 Implemented
MI0300 # 06 Y:2016 06 2016 PAY UTILITY BILLS ON TIME $37,529 $0 Implemented
MI0300 # 14 Y:2016 14 2016 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,797 $2,520 Implemented
MI0300 # 08 Y:2016 08 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $23,521 $1,660 Implemented
MI0300 # 07 Y:2016 07 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $23,599 $40 Implemented