IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

217

matching recommendations
Reset
SIC 28 Chemicals And Allied Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0569 # 06 Y:2016 06 2016 USE PHOTOCELL CONTROLS $423 $150 Implemented
NC0569 # 07 Y:2016 07 2016 DEVELOP A REPAIR/REPLACE POLICY $2,230 $4,256 Implemented
NC0569 # 08 Y:2016 08 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,856 $230 Not Implemented
OR0670 # 01 Y:2016 01 2016 REDUCE FLUID FLOW RATES $244,946 $880,000 Not Implemented
OR0670 # 02 Y:2016 02 2016 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $13,371 $5,100 Implemented
OR0670 # 03 Y:2016 03 2016 INSTALL OCCUPANCY SENSORS $14,066 $10,367 Implemented
OR0670 # 04 Y:2016 04 2016 TURN OFF EQUIPMENT WHEN NOT IN USE $8,978 $1,314 Implemented
OR0670 # 05 Y:2016 05 2016 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $8,398 $2,405 Not Implemented
OR0670 # 06 Y:2016 06 2016 USE SOLAR HEAT TO MAKE ELECTRICTY $29,141 $269,109 Not Implemented
DL0164 # 01 Y:2016 01 2016 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $109,877 $5,990 Not Implemented
DL0164 # 02 Y:2016 02 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $18,095 $32,300 Not Implemented
DL0164 # 03 Y:2016 03 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $16,513 $59,950 Implemented
DL0164 # 04 Y:2016 04 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,804 $11,335 Not Implemented
DL0164 # 05 Y:2016 05 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,606 $16,930 Not Implemented
DL0164 # 06 Y:2016 06 2016 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL $319,299 $522,826 Not Implemented
OR0669 # 01 Y:2016 01 2016 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $9,894 $5,100 Not Implemented
OR0669 # 02 Y:2016 02 2016 BURN WASTE OIL FOR HEAT $375,721 $189,945 Not Implemented
OR0669 # 03 Y:2016 03 2016 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $39,019 $15,722 Not Implemented
OR0669 # 04 Y:2016 04 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,352 $500 Not Implemented
OR0669 # 05 Y:2016 05 2016 INSTALL OCCUPANCY SENSORS $4,233 $5,720 Not Implemented
OR0669 # 06 Y:2016 06 2016 USE SOLAR HEAT TO MAKE ELECTRICTY $28,137 $340,762 Not Implemented
TT0169 # 01 Y:2016 01 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $30,315 $4,500 Implemented
TT0169 # 02 Y:2016 02 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $16,575 $3,500 Implemented
TT0169 # 03 Y:2016 03 2016 INSULATE BARE EQUIPMENT $3,461 $3,240 Implemented
TT0169 # 04 Y:2016 04 2016 INSTALL TIMERS AND/OR THERMOSTATS $2,943 $1,500 Implemented