Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
338
matching recommendationsSIC | 28 | Chemicals And Allied Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NC0219 # 04 Y:2001 | 04 | 2001 | INCREASE AMOUNT OF CONDENSATE RETURNED | $60,106 | $92,100 | n/a |
NC0219 # 05 Y:2001 | 05 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $199 | $1,000 | Not Implemented |
NC0215 # 01 Y:2001 | 01 | 2001 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $4,150 | $1,000 | Not Implemented |
NC0215 # 02 Y:2001 | 02 | 2001 | AIR CONDITION ONLY SPACE NECESSARY | $1,330 | $4,000 | Not Implemented |
NC0215 # 03 Y:2001 | 03 | 2001 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $91 | $65 | Not Implemented |
NC0215 # 04 Y:2001 | 04 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $93 | $100 | Implemented |
NC0215 # 05 Y:2001 | 05 | 2001 | USE ULTRASONIC CLEANING | $19,642 | $5,000 | Not Implemented |
NC0215 # 06 Y:2001 | 06 | 2001 | $240,000 | $270,000 | Not Implemented | |
NC0211 # 01 Y:2001 | 01 | 2001 | UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM | $23,426 | $20,000 | Implemented |
NC0211 # 02 Y:2001 | 02 | 2001 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,719 | $800 | Implemented |
NC0211 # 03 Y:2001 | 03 | 2001 | USE MINIMUM STEAM OPERATING PRESSURE | $2,014 | $250 | Implemented |
NC0211 # 04 Y:2001 | 04 | 2001 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $1,453 | $6,000 | Implemented |
NC0211 # 05 Y:2001 | 05 | 2001 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,002 | $1,028 | Not Implemented |
NC0211 # 06 Y:2001 | 06 | 2001 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $2,631 | $0 | Implemented |
NC0211 # 07 Y:2001 | 07 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,506 | $1,239 | Not Implemented |
NC0211 # 08 Y:2001 | 08 | 2001 | ADOPT IN-HOUSE MATERIAL GENERATION | $5,184 | $9,200 | Not Implemented |
NC0189 # 01 Y:2000 | 01 | 2000 | ADJUST BURNERS FOR EFFICIENT OPERATION | $1,081 | $800 | Implemented |
NC0189 # 02 Y:2000 | 02 | 2000 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,257 | $180 | Not Implemented |
NC0189 # 03 Y:2000 | 03 | 2000 | USE OPTIMUM THICKNESS INSULATION | $1,275 | $2,668 | Not Implemented |
NC0189 # 04 Y:2000 | 04 | 2000 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,822 | $100 | Not Implemented |
NC0189 # 05 Y:2000 | 05 | 2000 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $5,045 | $600 | Not Implemented |
NC0189 # 06 Y:2000 | 06 | 2000 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $4,905 | $15,000 | Not Implemented |
NC0189 # 07 Y:2000 | 07 | 2000 | INSTALL SHELVES / RACKS TO UTILIZE UNUSED SPACE | $35,750 | $0 | Not Implemented |
NC0189 # 08 Y:2000 | 08 | 2000 | IMPROVE SPACE COMFORT CONDITIONING | $9,564 | $17,000 | Not Implemented |
NC0143 # 01 Y:1998 | 01 | 1998 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,467 | $700 | Implemented |