IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

481

matching recommendations
Reset
SIC 281 Industrial Inorganic Chemicals
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0112 # 03 Y:2006 03 2006 CONVERT FROM INDIRECT TO DIRECT FIRED SYSTEMS $44,296 $145,126 Implemented
IC0112 # 06 Y:2006 06 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $48,787 $157,465 Implemented
IC0112 # 07 Y:2006 07 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,753 $2,300 Implemented
IC0112 # 08 Y:2006 08 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,114 $0 Implemented
IC0111 # 01 Y:2006 01 2006 REPLACE STEAM JETS ON VACUUM SYSTEM WITH ELECTRIC MOTOR DRIVEN VACUUM PUMPS $803,012 $258,000 Implemented
IC0111 # 04 Y:2006 04 2006 INCREASE AMOUNT OF CONDENSATE RETURNED $93,000 $235,998 Implemented
IC0111 # 07 Y:2006 07 2006 USE MINIMUM STEAM OPERATING PRESSURE $22,776 $0 Implemented
IC0111 # 08 Y:2006 08 2006 REPAIR AND ELIMINATE STEAM LEAKS $9,304 $2,800 Implemented
IC0111 # 09 Y:2006 09 2006 REPAIR OR REPLACE STEAM TRAPS $158,427 $5,152 Implemented
IC0111 # 10 Y:2006 10 2006 INSTALL / REPAIR INSULATION ON STEAM LINES $17,406 $19,704 Implemented
IC0111 # 11 Y:2006 11 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $23,163 $1,600 Implemented
IC0111 # 12 Y:2006 12 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $45,671 $195,432 Implemented
LE0215 # 01 Y:2005 01 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $99,127 $115,500 Implemented
LE0215 # 04 Y:2005 04 2005 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $8,220 $1,588 Implemented
MS0256 # 03 Y:2004 03 2004 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $34,367 $1,000 Implemented
MS0256 # 04 Y:2004 04 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,725 $3,794 Implemented
MS0256 # 06 Y:2004 06 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,126 $422 Implemented
TA0088 # 01 Y:2004 01 2004 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS $146,590 $20,000 Implemented
TA0088 # 03 Y:2004 03 2004 INSULATE BARE EQUIPMENT $66,520 $1,010 Implemented
TA0088 # 05 Y:2004 05 2004 USE DIRECT AIR SUPPLY TO EXHAUST HOODS $15,810 $2,000 Implemented
TA0088 # 06 Y:2004 06 2004 REDUCE OR ELIMINATE WASTE $18,000 $1,000 Implemented
TA0088 # 07 Y:2004 07 2004 INSTALL / REPAIR INSULATION ON STEAM LINES $3,995 $1,000 Implemented
UD0704 # 01 Y:2004 01 2004 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $10,368 $0 Implemented
UD0704 # 03 Y:2004 03 2004 UPGRADE CONTROLS ON COMPRESSORS $846 $900 Implemented
UD0704 # 04 Y:2004 04 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $668 $700 Implemented