IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

355

matching recommendations
Reset
SIC 2819 Industrial Inorganic Chemicals, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MS0256 # 04 Y:2004 04 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,725 $3,794 Implemented
MS0256 # 03 Y:2004 03 2004 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $34,367 $1,000 Implemented
TA0088 # 07 Y:2004 07 2004 INSTALL / REPAIR INSULATION ON STEAM LINES $3,995 $1,000 Implemented
TA0088 # 06 Y:2004 06 2004 REDUCE OR ELIMINATE WASTE $18,000 $1,000 Implemented
TA0088 # 05 Y:2004 05 2004 USE DIRECT AIR SUPPLY TO EXHAUST HOODS $15,810 $2,000 Implemented
TA0088 # 03 Y:2004 03 2004 INSULATE BARE EQUIPMENT $66,520 $1,010 Implemented
TA0088 # 01 Y:2004 01 2004 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS $146,590 $20,000 Implemented
UD0704 # 06 Y:2004 06 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $504 $0 Implemented
UD0704 # 07 Y:2004 07 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $223 $500 Implemented
UD0704 # 04 Y:2004 04 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $668 $700 Implemented
UD0704 # 03 Y:2004 03 2004 UPGRADE CONTROLS ON COMPRESSORS $846 $900 Implemented
UD0704 # 01 Y:2004 01 2004 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $10,368 $0 Implemented
GT0790 # 03 Y:2004 03 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $809 $1,970 Implemented
GT0790 # 07 Y:2004 07 2004 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $4,972 $0 Implemented
OR0455 # 05 Y:2004 05 2004 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $1,420 $150 Implemented
OR0455 # 04 Y:2004 04 2004 INSTALL OCCUPANCY SENSORS $2,140 $1,750 Implemented
OR0455 # 02 Y:2004 02 2004 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $9,570 $0 Implemented
OR0455 # 01 Y:2004 01 2004 RECOVER AND REUSE WASTE MATERIAL $45,100 $16,200 Implemented
LL0159 # 06 Y:2003 06 2003 INSULATE BARE EQUIPMENT $4,389 $642 Implemented
MA0539 # 04 Y:2003 04 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $183 $0 Implemented
MA0539 # 03 Y:2003 03 2003 REDUCE VENTILATION AIR $301 $800 Implemented
MA0539 # 02 Y:2003 02 2003 INSTALL TIMERS AND/OR THERMOSTATS $5,957 $650 Implemented
LL0159 # 04 Y:2003 04 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,635 $20 Implemented
LL0159 # 03 Y:2003 03 2003 USE PHOTOCELL CONTROLS $19,066 $924 Implemented
LL0159 # 02 Y:2003 02 2003 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $217,796 $12,400 Implemented