IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

40

matching recommendations
Reset
SIC 2821 Plastics Materials And Resins
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0332 # 08 Y:2022 08 2022 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $58,961 $200,000 Implemented
MZ0332 # 04 Y:2022 04 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,676 $1,330 Implemented
MZ0332 # 01 Y:2022 01 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,571 $18,580 Implemented
MZ0159 # 05 Y:2014 05 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,788 $23,000 Implemented
MZ0159 # 04 Y:2014 04 2014 INCREASE AMOUNT OF CONDENSATE RETURNED $12,895 $37,500 Implemented
MZ0159 # 03 Y:2014 03 2014 INSULATE BARE EQUIPMENT $1,973 $1,599 Implemented
MZ0159 # 02 Y:2014 02 2014 INSULATE BARE EQUIPMENT $428 $1,200 Implemented
MZ0105 # 02 Y:2012 02 2012 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $42,257 $4,645 Implemented
MZ0105 # 01 Y:2012 01 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,823 $28,300 Implemented
MZ0105 # 04 Y:2012 04 2012 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $8,215 $52,200 Implemented
MZ0105 # 09 Y:2012 09 2012 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $2,288 $2,000 Implemented
MZ0047 # 02 Y:2010 02 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,170 $1,300 Implemented
MZ0047 # 11 Y:2010 11 2010 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,718 $0 Implemented
MZ0047 # 10 Y:2010 10 2010 ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE $3,994 $0 Implemented
MZ0047 # 09 Y:2010 09 2010 INSTALL OCCUPANCY SENSORS $6,528 $760 Implemented
MZ0047 # 08 Y:2010 08 2010 INSULATE BARE EQUIPMENT $225 $360 Implemented
MZ0047 # 07 Y:2010 07 2010 INSULATE BARE EQUIPMENT $785 $400 Implemented
MZ0047 # 06 Y:2010 06 2010 INSULATE BARE EQUIPMENT $929 $2,160 Implemented
MZ0047 # 05 Y:2010 05 2010 INSULATE BARE EQUIPMENT $65 $180 Implemented
MZ0047 # 04 Y:2010 04 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,818 $20,818 Implemented
MZ0047 # 01 Y:2010 01 2010 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,104 $3,000 Implemented
MO0283 # 07 Y:2000 07 2000 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $9,128 $3,700 Implemented
MO0283 # 06 Y:2000 06 2000 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $9,720 $0 Implemented
MO0283 # 05 Y:2000 05 2000 REDUCE / ELIMINATE USE OF DISPOSABLE PRODUCT $460 $900 Implemented
MO0283 # 03 Y:2000 03 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $594 $122 Implemented