IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

60

matching recommendations
Reset
SIC 2822 Synthetic Rubber
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0643 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $59,445 $139,040 Implemented
NC0643 # 02 Y:2019 02 2019 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $9,495 $1,000 Implemented
LS1801 # 01 Y:2018 01 2018 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $69,575 $0 Implemented
AM0701 # 01 Y:2016 01 2016 REPAIR OR REPLACE STEAM TRAPS $515,000 $75,000 Implemented
AM0701 # 02 Y:2016 02 2016 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $195,000 $2,000 Implemented
AM0701 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $73,125 $105,700 Implemented
AM0701 # 04 Y:2016 04 2016 PAY UTILITY BILLS ON TIME $57,500 $0 Implemented
AM0701 # 06 Y:2016 06 2016 USE SYNTHETIC LUBRICANT $35,540 $0 Implemented
AM0701 # 08 Y:2016 08 2016 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,420 $210 Implemented
AM0701 # 09 Y:2016 09 2016 INSULATE BARE EQUIPMENT $1,325 $1,200 Implemented
DL0134 # 01 Y:2014 01 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $36,000 $33,600 Implemented
DL0134 # 02 Y:2014 02 2014 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $41,430 $54,000 Implemented
DL0134 # 03 Y:2014 03 2014 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $16,580 $0 Implemented
DL0134 # 08 Y:2014 08 2014 METER WASTE WATER $8,610 $8,200 Implemented
NC0438 # 08 Y:2011 08 2011 INSTALL OCCUPANCY SENSORS $1,416 $2,112 Implemented
NC0438 # 07 Y:2011 07 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,224 $300 Implemented
NC0438 # 02 Y:2011 02 2011 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $8,972 $7,800 Implemented
WI0513 # 01 Y:2006 01 2006 IMPROVE SPACE COMFORT CONDITIONING $42,840 $1,800 Implemented
WI0513 # 07 Y:2006 07 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,529 $0 Implemented
WI0513 # 04 Y:2006 04 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,710 $5,940 Implemented
WI0513 # 08 Y:2006 08 2006 INSTALL TIMERS AND/OR THERMOSTATS $1,291 $400 Implemented
WI0513 # 09 Y:2006 09 2006 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,277 $200 Implemented
AM0420 # 10 Y:2002 10 2002 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $700 $0 Implemented
AM0420 # 09 Y:2002 09 2002 USE PHOTOCELL CONTROLS $1,500 $2,300 Implemented
AM0420 # 08 Y:2002 08 2002 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $2,500 $150 Implemented