IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

28

matching recommendations
Reset
SIC 283 Drugs
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NL0061 # 05 Y:2022 05 2022 RECOVER AND REUSE WASTE MATERIAL $3,432 $3,500 Implemented
NL0061 # 03 Y:2022 03 2022 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $4,939 $70 Implemented
NL0061 # 02 Y:2022 02 2022 USE POWER DURING OFF-PEAK PERIODS $9,080 $70 Implemented
NL0061 # 08 Y:2022 08 2022 INSTALL OCCUPANCY SENSORS $595 $1,289 Implemented
NL0061 # 06 Y:2022 06 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,556 $2,500 Implemented
NL0041 # 08 Y:2019 08 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $197 $674 Implemented
NL0041 # 07 Y:2019 07 2019 REPAIR AND ELIMINATE STEAM LEAKS $2,123 $200 Implemented
NL0041 # 05 Y:2019 05 2019 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $5,000 $19,750 Implemented
NL0041 # 04 Y:2019 04 2019 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,670 $100 Implemented
NL0041 # 03 Y:2019 03 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,751 $600 Implemented
NL0041 # 02 Y:2019 02 2019 OPTIMIZE PLANT POWER FACTOR $10,636 $52,000 Implemented
NL0041 # 01 Y:2019 01 2019 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $238,833 $700,000 Implemented
IA0183 # 02 Y:1997 02 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,353 $3,856 Implemented
IA0183 # 08 Y:1997 08 1997 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $17,122 $4,200 Implemented
IA0183 # 06 Y:1997 06 1997 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $2,112 $600 Implemented
IA0183 # 05 Y:1997 05 1997 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $4,639 $8,400 Implemented
IA0183 # 01 Y:1997 01 1997 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $6,078 $68,000 Implemented
KU0408 # 04 Y:1993 04 1993 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,399 $300 Implemented
KU0408 # 07 Y:1993 07 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $176 $392 Implemented
KU0408 # 08 Y:1993 08 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $776 $0 Implemented
KU0408 # 03 Y:1993 03 1993 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $176 $0 Implemented
KU0408 # 01 Y:1993 01 1993 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,776 $5,655 Implemented
KU0266 # 05 Y:1988 05 1988 RECOVER AND REUSE COOLING WATER $791 $860 Implemented
KU0266 # 04 Y:1988 04 1988 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,624 $100 Implemented
KU0266 # 02 Y:1988 02 1988 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $8,274 $1,008 Implemented