IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

34

matching recommendations
Reset
SIC 283 Drugs
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0696 # 02 Y:2014 02 2014 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $4,140 $500 Implemented
CO0696 # 04 Y:2014 04 2014 INSTALL / REPAIR INSULATION ON STEAM LINES $310 $480 Implemented
CO0569 # 11 Y:2005 11 2005 INSTALL OCCUPANCY SENSORS $560 $710 Implemented
CO0569 # 09 Y:2005 09 2005 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,600 $1,980 Implemented
CO0569 # 08 Y:2005 08 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,770 $3,520 Implemented
CO0569 # 05 Y:2005 05 2005 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $2,040 $1,980 Implemented
CO0569 # 04 Y:2005 04 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,930 $7,590 Implemented
CO0569 # 02 Y:2005 02 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $14,470 $1,000 Implemented
CO0521 # 04 Y:2003 04 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,000 $200 Implemented
CO0521 # 03 Y:2003 03 2003 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $2,010 $1,400 Implemented
CO0520 # 04 Y:2003 04 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,460 $260 Implemented
CO0431 # 06 Y:1999 06 1999 $638,100 $0 Implemented
CO0431 # 07 Y:1999 07 1999 $44,640 $0 Implemented
CO0431 # 03 Y:1999 03 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,340 $610 Implemented
CO0431 # 02 Y:1999 02 1999 INSTALL TURBULATORS $1,830 $3,630 Implemented
CO0431 # 01 Y:1999 01 1999 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $16,420 $21,500 Implemented
CO0430 # 05 Y:1998 05 1998 SELL COMBUSTIBLE WASTE $15,970 $56,700 Implemented
CO0430 # 04 Y:1998 04 1998 USE DISTILLATION, EVAPORATION TO REMOVE CONTAMINANTS $-210 $2,000 Implemented
CO0430 # 03 Y:1998 03 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,470 $1,280 Implemented
CO0430 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,060 $12,077 Implemented
CO0422 # 09 Y:1998 09 1998 $9,500 $0 Implemented
CO0422 # 07 Y:1998 07 1998 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $400 $130 Implemented
CO0422 # 08 Y:1998 08 1998 $158,670 $50,000 Implemented
CO0422 # 01 Y:1998 01 1998 CHECK FOR ACCURACY OF UTILITY / POWER METERS $5,830 $0 Implemented
CO0422 # 03 Y:1998 03 1998 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $880 $2,000 Implemented