Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
28
matching recommendationsSIC | 283 | Drugs |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NL0061 # 08 Y:2022 | 08 | 2022 | INSTALL OCCUPANCY SENSORS | $595 | $1,289 | Implemented |
NL0061 # 06 Y:2022 | 06 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,556 | $2,500 | Implemented |
NL0061 # 05 Y:2022 | 05 | 2022 | RECOVER AND REUSE WASTE MATERIAL | $3,432 | $3,500 | Implemented |
NL0061 # 03 Y:2022 | 03 | 2022 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $4,939 | $70 | Implemented |
NL0061 # 02 Y:2022 | 02 | 2022 | USE POWER DURING OFF-PEAK PERIODS | $9,080 | $70 | Implemented |
NL0041 # 08 Y:2019 | 08 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $197 | $674 | Implemented |
NL0041 # 07 Y:2019 | 07 | 2019 | REPAIR AND ELIMINATE STEAM LEAKS | $2,123 | $200 | Implemented |
NL0041 # 05 Y:2019 | 05 | 2019 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $5,000 | $19,750 | Implemented |
NL0041 # 04 Y:2019 | 04 | 2019 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $5,670 | $100 | Implemented |
NL0041 # 01 Y:2019 | 01 | 2019 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $238,833 | $700,000 | Implemented |
NL0041 # 02 Y:2019 | 02 | 2019 | OPTIMIZE PLANT POWER FACTOR | $10,636 | $52,000 | Implemented |
NL0041 # 03 Y:2019 | 03 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,751 | $600 | Implemented |
IA0183 # 02 Y:1997 | 02 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,353 | $3,856 | Implemented |
IA0183 # 08 Y:1997 | 08 | 1997 | PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER | $17,122 | $4,200 | Implemented |
IA0183 # 06 Y:1997 | 06 | 1997 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $2,112 | $600 | Implemented |
IA0183 # 05 Y:1997 | 05 | 1997 | LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER | $4,639 | $8,400 | Implemented |
IA0183 # 01 Y:1997 | 01 | 1997 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $6,078 | $68,000 | Implemented |
KU0408 # 08 Y:1993 | 08 | 1993 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $776 | $0 | Implemented |
KU0408 # 07 Y:1993 | 07 | 1993 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $176 | $392 | Implemented |
KU0408 # 04 Y:1993 | 04 | 1993 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,399 | $300 | Implemented |
KU0408 # 03 Y:1993 | 03 | 1993 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $176 | $0 | Implemented |
KU0408 # 01 Y:1993 | 01 | 1993 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $3,776 | $5,655 | Implemented |
KU0266 # 01 Y:1988 | 01 | 1988 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $487 | $282 | Implemented |
KU0266 # 02 Y:1988 | 02 | 1988 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $8,274 | $1,008 | Implemented |
KU0266 # 04 Y:1988 | 04 | 1988 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,624 | $100 | Implemented |