IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,141

matching recommendations
Reset
SIC 2834 Pharmaceutical Preparations
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0910 # 08 Y:2014 08 2014 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $377,548 $1,083,820 Implemented
UD0910 # 09 Y:2014 09 2014 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $45,862 $9,000 Not Implemented
UD0910 # 10 Y:2014 10 2014 REUSE / RECYCLE/ SELL PAPER PRODUCTS $22,280 $0 Implemented
UD0910 # 11 Y:2014 11 2014 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $8,744 $12,000 Implemented
UD0910 # 12 Y:2014 12 2014 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE $3,390 $0 Not Implemented
CO0692 # 01 Y:2014 01 2014 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,780 $10,910 Not Implemented
CO0692 # 02 Y:2014 02 2014 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $39,420 $1,250 Implemented
CO0692 # 03 Y:2014 03 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,790 $21,020 Implemented
MZ0149 # 01 Y:2014 01 2014 INSTALL OCCUPANCY SENSORS $18,116 $16,400 Implemented
MZ0149 # 02 Y:2014 02 2014 INSTALL OCCUPANCY SENSORS $4,128 $6,040 Implemented
MZ0149 # 03 Y:2014 03 2014 LOWER CEILING TO REDUCE CONDITIONED SPACE $9,091 $25,000 Not Implemented
MZ0149 # 04 Y:2014 04 2014 LOWER CEILING TO REDUCE CONDITIONED SPACE $6,580 $25,750 Not Implemented
MZ0149 # 05 Y:2014 05 2014 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $14,550 $28,000 Not Implemented
MZ0149 # 06 Y:2014 06 2014 AIR CONDITION ONLY SPACE NECESSARY $46,961 $5,500 Not Implemented
MI0256 # 01 Y:2014 01 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $23,834 $20,160 Not Implemented
MI0256 # 02 Y:2014 02 2014 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $23,626 $13,599 Implemented
MI0256 # 03 Y:2014 03 2014 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $23,619 $80 Implemented
MI0256 # 04 Y:2014 04 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $14,420 $1,660 Implemented
MI0256 # 05 Y:2014 05 2014 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $11,196 $3,960 Implemented
MI0256 # 06 Y:2014 06 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,634 $80 Implemented
MI0256 # 07 Y:2014 07 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,540 $3,240 Not Implemented
MI0256 # 08 Y:2014 08 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,517 $3,360 Not Implemented
MI0256 # 09 Y:2014 09 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,183 $6,800 Not Implemented
MI0255 # 01 Y:2014 01 2014 TURN OFF EQUIPMENT WHEN NOT IN USE $9,165 $1,800 Implemented
MI0255 # 02 Y:2014 02 2014 OPTIMIZE PLANT POWER FACTOR $8,786 $800 Implemented