IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

28

matching recommendations
Reset
SIC 285 Paints And Allied Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0579 # 09 Y:2019 09 2019 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $589 $1,000 Implemented
WV0579 # 05 Y:2019 05 2019 DEVELOP A REPAIR/REPLACE POLICY $4,488 $879 Implemented
WV0579 # 02 Y:2019 02 2019 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $18,379 $3,500 Implemented
WV0579 # 10 Y:2019 10 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $346 $33 Implemented
UD0898 # 08 Y:2014 08 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $309 $0 Implemented
UD0898 # 07 Y:2014 07 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $621 $20 Implemented
UD0898 # 04 Y:2014 04 2014 COVER OPEN TANKS $57 $200 Implemented
UD0898 # 01 Y:2014 01 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $156 $50 Implemented
UD0886 # 12 Y:2013 12 2013 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $3,648 $6,720 Implemented
UD0886 # 14 Y:2013 14 2013 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $2,995 $0 Implemented
UD0886 # 07 Y:2013 07 2013 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $36,728 $14,900 Implemented
UD0886 # 11 Y:2013 11 2013 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $341 $0 Implemented
WV0276 # 02 Y:2003 02 2003 INSTALL TIMERS AND/OR THERMOSTATS $33,509 $580 Implemented
WV0276 # 11 Y:2003 11 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $744 $320 Implemented
WV0276 # 09 Y:2003 09 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,770 $80 Implemented
WV0276 # 08 Y:2003 08 2003 INSTALL OCCUPANCY SENSORS $2,514 $2,200 Implemented
WV0276 # 07 Y:2003 07 2003 REPAIR OR REPLACE STEAM TRAPS $2,328 $480 Implemented
WV0276 # 06 Y:2003 06 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,737 $16,926 Implemented
WV0276 # 05 Y:2003 05 2003 USE OPTIMUM THICKNESS INSULATION $8,395 $2,640 Implemented
WV0276 # 01 Y:2003 01 2003 INSTALL WASTE HEAT BOILER TO PRODUCE STEAM $41,760 $60,000 Implemented
UM0188 # 05 Y:2001 05 2001 INSTALL AN UNINTERUPTABLE POWER SUPPLY $3,333 $1,500 Implemented
UD0111 # 03 Y:1983 03 1983 INSTALL STORM WINDOWS AND DOORS $4,375 $2,890 Implemented
UD0111 # 04 Y:1983 04 1983 INSTALL STORM WINDOWS AND DOORS $928 $1,200 Implemented
UD0111 # 01 Y:1983 01 1983 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $992 $600 Implemented
UD0105 # 04 Y:1983 04 1983 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,661 $167 Implemented