IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

34

matching recommendations
Reset
SIC 2869 Industrial Organic Chemicals, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD1032 # 06 Y:2022 06 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,104 $0 Implemented
UD1032 # 04 Y:2022 04 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $68,929 $100,000 Implemented
UD0966 # 07 Y:2017 07 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $383,642 $613,600 Implemented
UD0750 # 09 Y:2006 09 2006 REPAIR AND ELIMINATE STEAM LEAKS $24,000 $13,000 Implemented
UD0750 # 06 Y:2006 06 2006 INCREASE AMOUNT OF CONDENSATE RETURNED $44,000 $25,000 Implemented
UD0750 # 03 Y:2006 03 2006 REPAIR OR REPLACE STEAM TRAPS $155,000 $187,200 Implemented
UD0750 # 02 Y:2006 02 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $226,890 $120,000 Implemented
UD0750 # 04 Y:2006 04 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $79,000 $45,000 Implemented
UD0745 # 12 Y:2006 12 2006 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $941 $0 Implemented
UD0745 # 11 Y:2006 11 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,408 $0 Implemented
UD0745 # 10 Y:2006 10 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,746 $8,200 Implemented
UD0745 # 07 Y:2006 07 2006 USE OPTIMUM THICKNESS INSULATION $8,710 $4,000 Implemented
UD0745 # 02 Y:2006 02 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,807 $34,035 Implemented
UD0745 # 01 Y:2006 01 2006 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $18,706 $0 Implemented
UD0516 # 02 Y:1997 02 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,524 $8,150 Implemented
UD0516 # 04 Y:1997 04 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,205 $978 Implemented
UD0513 # 04 Y:1997 04 1997 OPTIMIZE PLANT POWER FACTOR $21,006 $25,000 Implemented
UD0513 # 05 Y:1997 05 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,283 $6,465 Implemented
UD0513 # 06 Y:1997 06 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,603 $19,910 Implemented
UD0513 # 07 Y:1997 07 1997 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,228 $16,000 Implemented
UD0408 # 05 Y:1993 05 1993 INSTALL TIMERS AND/OR THERMOSTATS $6,067 $3,000 Implemented
UD0408 # 04 Y:1993 04 1993 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $13,391 $10,000 Implemented
UD0408 # 03 Y:1993 03 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,726 $0 Implemented
UD0408 # 02 Y:1993 02 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,052 $21,676 Implemented
UD0408 # 01 Y:1993 01 1993 INCREASE ELECTRICAL CONDUCTOR SIZE TO REDUCE DISTRIBUTION LOSSES $2,008 $1,500 Implemented