IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

731

matching recommendations
Reset
SIC 289 Miscellaneous Chemical Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0403 # 10 Y:2010 10 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,238 $110 Implemented
WV0403 # 11 Y:2010 11 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,180 $748 Implemented
GT0871 # 01 Y:2010 01 2010 INSTALL / REPAIR INSULATION ON STEAM LINES $2,860 $768 Implemented
GT0871 # 03 Y:2010 03 2010 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $40,118 $23,620 Implemented
GT0871 # 07 Y:2010 07 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,563 $17,696 Implemented
UM0359 # 01 Y:2009 01 2009 REDUCE VENTILATION AIR $20,146 $500 Implemented
UM0359 # 02 Y:2009 02 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,026 $50,000 Implemented
UM0359 # 03 Y:2009 03 2009 LOWER COMPRESSOR PRESSURE THROUGH A/C SYSTEM MODIFICATION $13,963 $400 Implemented
UM0359 # 05 Y:2009 05 2009 INSTALL STORM WINDOWS AND DOORS $6,298 $24,510 Implemented
UM0359 # 08 Y:2009 08 2009 RECOVER WASTE HEAT FROM EQUIPMENT $1,620 $10,000 Implemented
UM0359 # 09 Y:2009 09 2009 INSTALL OCCUPANCY SENSORS $1,161 $30,000 Implemented
UM0359 # 10 Y:2009 10 2009 INSTALL / REPAIR INSULATION ON STEAM LINES $472 $10,000 Implemented
UM0344 # 04 Y:2008 04 2008 $8,182 $7,500 Implemented
GT0854 # 01 Y:2008 01 2008 REPAIR AND ELIMINATE STEAM LEAKS $2,568 $700 Implemented
GT0854 # 02 Y:2008 02 2008 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,745 $3,000 Implemented
GT0854 # 04 Y:2008 04 2008 REPAIR OR REPLACE STEAM TRAPS $25,424 $5,000 Implemented
GT0854 # 08 Y:2008 08 2008 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $14,260 $23,000 Implemented
GT0854 # 09 Y:2008 09 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,015 $35,125 Implemented
TA0132 # 04 Y:2006 04 2006 INSTALL / REPAIR INSULATION ON STEAM LINES $1,855 $277 Implemented
TA0132 # 05 Y:2006 05 2006 INSTALL / REPAIR INSULATION ON STEAM LINES $1,580 $826 Implemented
SD0386 # 02 Y:2006 02 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $956 $8,800 Implemented
WV0346 # 01 Y:2006 01 2006 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $12,230 $1,143 Implemented
WV0346 # 02 Y:2006 02 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,998 $13,688 Implemented
WV0346 # 06 Y:2006 06 2006 INSULATE BARE EQUIPMENT $1,502 $737 Implemented
WV0346 # 07 Y:2006 07 2006 DEVELOP A REPAIR/REPLACE POLICY $850 $230 Implemented