IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

71

matching recommendations
Reset
SIC 289 Miscellaneous Chemical Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0887 # 01 Y:2013 01 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,553 $50 Implemented
UD0887 # 03 Y:2013 03 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $497 $500 Implemented
UD0887 # 04 Y:2013 04 2013 INSTALL SPECTRAL REFLECTORS / DELAMP $8,763 $2,075 Implemented
UD0887 # 06 Y:2013 06 2013 ADD AREA LIGHTING SWITCHES $594 $350 Implemented
UD0887 # 11 Y:2013 11 2013 DEVELOP A REPAIR/REPLACE POLICY $2,637 $3,420 Implemented
UD0887 # 13 Y:2013 13 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $383 $0 Implemented
WV0416 # 08 Y:2010 08 2010 DEVELOP A REPAIR/REPLACE POLICY $3,797 $830 Implemented
WV0416 # 07 Y:2010 07 2010 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $4,558 $1,000 Implemented
WV0416 # 02 Y:2010 02 2010 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $8,496 $2,500 Implemented
WV0416 # 09 Y:2010 09 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,776 $1,360 Implemented
UD0615 # 06 Y:2001 06 2001 RECOVER WASTE HEAT FROM EQUIPMENT $5,831 $8,500 Implemented
UD0615 # 02 Y:2001 02 2001 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $17,160 $0 Implemented
UD0615 # 01 Y:2001 01 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,423 $42,285 Implemented
UD0607 # 05 Y:2000 05 2000 INSULATE BARE EQUIPMENT $1,428 $3,135 Implemented
UD0607 # 03 Y:2000 03 2000 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $3,566 $0 Implemented
UD0607 # 04 Y:2000 04 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,478 $7,485 Implemented
UD0509 # 10 Y:1996 10 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,492 $3,080 Implemented
UD0509 # 09 Y:1996 09 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $512 $1,600 Implemented
UD0509 # 07 Y:1996 07 1996 USE PHOTOCELL CONTROLS $1,279 $621 Implemented
UD0509 # 03 Y:1996 03 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,600 $5,000 Implemented
UD0509 # 02 Y:1996 02 1996 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $10,840 $0 Implemented
UD0271 # 05 Y:1989 05 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,761 $27,100 Implemented
UD0271 # 04 Y:1989 04 1989 RECOVER WASTE HEAT FROM EQUIPMENT $2,591 $500 Implemented
UD0271 # 03 Y:1989 03 1989 REDESIGN PROCESS $62,230 $10,000 Implemented
UD0271 # 02 Y:1989 02 1989 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,360 $0 Implemented