Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
598
matching recommendationsSIC | 2891 | Adhesives And Sealants |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IP0098 # 01 Y:2018 | 01 | 2018 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $1,587 | $0 | Implemented |
IP0097 # 09 Y:2018 | 09 | 2018 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $1,786 | $1,576 | Not Implemented |
IP0097 # 08 Y:2018 | 08 | 2018 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $25,428 | $6,125 | Not Implemented |
IP0097 # 07 Y:2018 | 07 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,259 | $15,632 | Implemented |
IP0097 # 06 Y:2018 | 06 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $183 | $639 | Not Implemented |
IP0097 # 05 Y:2018 | 05 | 2018 | APPLY FOR INVESTMENT INCENTIVES | $161 | $100 | Implemented |
IP0097 # 04 Y:2018 | 04 | 2018 | OPTIMIZE PLANT POWER FACTOR | $7,330 | $4,122 | Not Implemented |
IP0097 # 03 Y:2018 | 03 | 2018 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $3,492 | $600 | Implemented |
IP0097 # 02 Y:2018 | 02 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,685 | $275 | Implemented |
IP0097 # 01 Y:2018 | 01 | 2018 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $3,602 | $25 | Implemented |
UK1613 # 01 Y:2017 | 01 | 2017 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $8,528 | $35,000 | Not Implemented |
UK1613 # 02 Y:2017 | 02 | 2017 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $8,671 | $0 | Implemented |
UK1613 # 03 Y:2017 | 03 | 2017 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $1,962 | $4,550 | Not Implemented |
UK1613 # 04 Y:2017 | 04 | 2017 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $3,332 | $4,602 | Not Implemented |
UK1613 # 05 Y:2017 | 05 | 2017 | INSTALL OCCUPANCY SENSORS | $3,544 | $1,386 | Not Implemented |
UK1613 # 06 Y:2017 | 06 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,264 | $1,200 | Implemented |
UK1613 # 07 Y:2017 | 07 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $871 | $0 | Implemented |
UK1613 # 08 Y:2017 | 08 | 2017 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $535 | $0 | Implemented |
UK1613 # 09 Y:2017 | 09 | 2017 | USE ONLY CERTIFIED MOTOR REPAIR SHOPS | $478 | $756 | Implemented |
UK1613 # 10 Y:2017 | 10 | 2017 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $145 | $0 | Implemented |
SD0540 # 01 Y:2017 | 01 | 2017 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $42,256 | $168,000 | Not Implemented |
SD0540 # 02 Y:2017 | 02 | 2017 | USE POWER DURING OFF-PEAK PERIODS | $33,558 | $136,000 | Not Implemented |
SD0540 # 03 Y:2017 | 03 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $22,953 | $11,528 | Not Implemented |
SD0540 # 04 Y:2017 | 04 | 2017 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $17,767 | $20,883 | Not Implemented |
SD0540 # 05 Y:2017 | 05 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,414 | $16,180 | Not Implemented |