IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

598

matching recommendations
Reset
SIC 2891 Adhesives And Sealants
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IP0098 # 01 Y:2018 01 2018 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,587 $0 Implemented
IP0097 # 09 Y:2018 09 2018 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,786 $1,576 Not Implemented
IP0097 # 08 Y:2018 08 2018 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $25,428 $6,125 Not Implemented
IP0097 # 07 Y:2018 07 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,259 $15,632 Implemented
IP0097 # 06 Y:2018 06 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $183 $639 Not Implemented
IP0097 # 05 Y:2018 05 2018 APPLY FOR INVESTMENT INCENTIVES $161 $100 Implemented
IP0097 # 04 Y:2018 04 2018 OPTIMIZE PLANT POWER FACTOR $7,330 $4,122 Not Implemented
IP0097 # 03 Y:2018 03 2018 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $3,492 $600 Implemented
IP0097 # 02 Y:2018 02 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,685 $275 Implemented
IP0097 # 01 Y:2018 01 2018 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $3,602 $25 Implemented
UK1613 # 01 Y:2017 01 2017 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $8,528 $35,000 Not Implemented
UK1613 # 02 Y:2017 02 2017 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $8,671 $0 Implemented
UK1613 # 03 Y:2017 03 2017 PREHEAT COMBUSTION AIR WITH WASTE HEAT $1,962 $4,550 Not Implemented
UK1613 # 04 Y:2017 04 2017 PREHEAT COMBUSTION AIR WITH WASTE HEAT $3,332 $4,602 Not Implemented
UK1613 # 05 Y:2017 05 2017 INSTALL OCCUPANCY SENSORS $3,544 $1,386 Not Implemented
UK1613 # 06 Y:2017 06 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,264 $1,200 Implemented
UK1613 # 07 Y:2017 07 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $871 $0 Implemented
UK1613 # 08 Y:2017 08 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $535 $0 Implemented
UK1613 # 09 Y:2017 09 2017 USE ONLY CERTIFIED MOTOR REPAIR SHOPS $478 $756 Implemented
UK1613 # 10 Y:2017 10 2017 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $145 $0 Implemented
SD0540 # 01 Y:2017 01 2017 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $42,256 $168,000 Not Implemented
SD0540 # 02 Y:2017 02 2017 USE POWER DURING OFF-PEAK PERIODS $33,558 $136,000 Not Implemented
SD0540 # 03 Y:2017 03 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $22,953 $11,528 Not Implemented
SD0540 # 04 Y:2017 04 2017 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $17,767 $20,883 Not Implemented
SD0540 # 05 Y:2017 05 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,414 $16,180 Not Implemented