Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
336
matching recommendationsSIC | 2899 | Chemical Preparations, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SD0468 # 02 Y:2013 | 02 | 2013 | MODIFY STARTUP/SHUTDOWN TIMES | $7,607 | $1,050 | Implemented |
SD0468 # 01 Y:2013 | 01 | 2013 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $8,265 | $23,840 | Implemented |
IA0494 # 02 Y:2013 | 02 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $768 | $463 | Implemented |
IA0494 # 03 Y:2013 | 03 | 2013 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $4,490 | $1,500 | Implemented |
IA0494 # 04 Y:2013 | 04 | 2013 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $37,210 | $18,000 | Implemented |
IA0494 # 06 Y:2013 | 06 | 2013 | REPAIR AND ELIMINATE STEAM LEAKS | $512 | $600 | Implemented |
IA0494 # 07 Y:2013 | 07 | 2013 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $1,710 | $5,400 | Implemented |
MI0235 # 02 Y:2013 | 02 | 2013 | TURN OFF EQUIPMENT WHEN NOT IN USE | $13,438 | $1,800 | Implemented |
MI0235 # 03 Y:2013 | 03 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,094 | $13,735 | Implemented |
MI0235 # 05 Y:2013 | 05 | 2013 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $5,349 | $1,400 | Implemented |
MI0235 # 06 Y:2013 | 06 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,581 | $1,660 | Implemented |
MI0235 # 07 Y:2013 | 07 | 2013 | INSTALL OCCUPANCY SENSORS | $2,562 | $900 | Implemented |
MI0235 # 08 Y:2013 | 08 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,298 | $80 | Implemented |
MI0235 # 09 Y:2013 | 09 | 2013 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $1,188 | $40 | Implemented |
MI0235 # 10 Y:2013 | 10 | 2013 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $992 | $2,520 | Implemented |
MI0235 # 14 Y:2013 | 14 | 2013 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $648 | $693 | Implemented |
UF0451 # 06 Y:2011 | 06 | 2011 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $498 | $0 | Implemented |
UF0451 # 05 Y:2011 | 05 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,440 | $3,310 | Implemented |
UF0451 # 04 Y:2011 | 04 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,153 | $1,277 | Implemented |
UF0451 # 02 Y:2011 | 02 | 2011 | INSTALL COMMON HEADER ON COMPRESSORS | $8,773 | $222 | Implemented |
UF0451 # 01 Y:2011 | 01 | 2011 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $5,739 | $0 | Implemented |
UF0445 # 04 Y:2011 | 04 | 2011 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $25,323 | $75,000 | Implemented |
UF0445 # 01 Y:2011 | 01 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,864 | $4,542 | Implemented |
UF0445 # 09 Y:2011 | 09 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,370 | $8,778 | Implemented |
UF0445 # 06 Y:2011 | 06 | 2011 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $2,582 | $2,580 | Implemented |