IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

31

matching recommendations
Reset
SIC 2899 Chemical Preparations, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0229 # 06 Y:2019 06 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $25,286 $15,316 Implemented
IC0229 # 04 Y:2019 04 2019 ELIMINATE COOLING OF PROCESS STREAMS WHICH SUBSEQUENTLY MUST BE HEATED AND VICE VERSA $2,133 $2,010 Implemented
IC0229 # 01 Y:2019 01 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,396 $4,200 Implemented
IC0229 # 02 Y:2019 02 2019 INSULATE BARE EQUIPMENT $1,024 $1,131 Implemented
IC0229 # 03 Y:2019 03 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,701 $2,326 Implemented
IC0105 # 01 Y:2005 01 2005 INSTALL / REPAIR INSULATION ON STEAM LINES $60,808 $100,000 Implemented
IC0105 # 02 Y:2005 02 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $7,211 $2,000 Implemented
IC0105 # 03 Y:2005 03 2005 REPAIR AND ELIMINATE STEAM LEAKS $17,271 $3,900 Implemented
IC0087 # 03 Y:2004 03 2004 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $216,557 $4,311 Implemented
IC0087 # 04 Y:2004 04 2004 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $43,578 $6,900 Implemented
IC0087 # 06 Y:2004 06 2004 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $14,571 $8,465 Implemented
IC0087 # 07 Y:2004 07 2004 INSULATE BARE EQUIPMENT $28,383 $56,925 Implemented
IC0087 # 10 Y:2004 10 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,168 $79,350 Implemented
IC0087 # 12 Y:2004 12 2004 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $592 $174,800 Implemented
IC0058 # 02 Y:2003 02 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,668 $1,551 Implemented
IC0058 # 05 Y:2003 05 2003 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $6,017 $12,784 Implemented
IC0058 # 01 Y:2003 01 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,475 $9,774 Implemented
WI0300 # 06 Y:1997 06 1997 TURN OFF EQUIPMENT WHEN NOT IN USE $2,192 $0 Implemented
WI0300 # 11 Y:1997 11 1997 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $585 $0 Implemented
WI0300 # 04 Y:1997 04 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,810 $90 Implemented
WI0300 # 01 Y:1997 01 1997 INSTALL EQUIPMENT TO MOVE PRODUCT $61,113 $30,000 Implemented
WI0166 # 03 Y:1993 03 1993 TURN OFF EQUIPMENT WHEN NOT IN USE $1,023 $0 Implemented
WI0166 # 01 Y:1993 01 1993 CONSIDER THREE OR FOUR DAYS AROUND-THE-CLOCK OPERATION RATHER THAN ONE OR TWO SHIFTS PER DAY $1,244 $0 Implemented
WI0166 # 02 Y:1993 02 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,344 $1,560 Implemented
WI0065 # 06 Y:1989 06 1989 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,916 $0 Implemented