IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

694

matching recommendations
Reset
SIC 29 Petroleum And Coal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0236 # 02 Y:2000 02 2000 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $271,210 $1,150,000 Implemented
SD0236 # 04 Y:2000 04 2000 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $862 $388 Implemented
SD0236 # 05 Y:2000 05 2000 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $539 $0 Implemented
UL0235 # 02 Y:1999 02 1999 INSTALL / REPAIR INSULATION ON STEAM LINES $5,509 $2,875 Implemented
UF0231 # 03 Y:1999 03 1999 INSTALL / REPAIR INSULATION ON STEAM LINES $1,596 $450 Implemented
UF0231 # 05 Y:1999 05 1999 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,198 $1,000 Implemented
UF0231 # 07 Y:1999 07 1999 CONTRACT A WOOD PALLET RECYCLING COMPANY $1,200 $0 Implemented
UF0231 # 08 Y:1999 08 1999 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $1,562 $0 Implemented
NV0132 # 02 Y:1999 02 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,392 $39,424 Implemented
NV0132 # 06 Y:1999 06 1999 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $1,012 $0 Implemented
NV0132 # 07 Y:1999 07 1999 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $172,243 $54,000 Implemented
NV0131 # 03 Y:1999 03 1999 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,277 $638 Implemented
NV0131 # 04 Y:1999 04 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $111 $80 Implemented
NV0131 # 05 Y:1999 05 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $327 $0 Implemented
NV0131 # 06 Y:1999 06 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $444 $50 Implemented
TN0656 # 02 Y:1999 02 1999 OPERATE BOILERS ON HIGH FIRE SETTING $175,220 $82,400 Implemented
TN0656 # 04 Y:1999 04 1999 INSTALL AUTOMATIC BOILER FUEL FEED SYSTEM $130,100 $137,500 Implemented
TN0656 # 05 Y:1999 05 1999 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $22,000 $0 Implemented
NC0164 # 07 Y:1999 07 1999 ADOPT IN-HOUSE MATERIAL GENERATION $1,975 $2,500 Implemented
NC0164 # 06 Y:1999 06 1999 BURN WASTE OIL FOR HEAT $40,650 $30,000 Implemented
NC0164 # 05 Y:1999 05 1999 MINIMIZE WATER USAGE $1,767 $0 Implemented
NC0164 # 04 Y:1999 04 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,553 $9,000 Implemented
NC0164 # 03 Y:1999 03 1999 INSTALL SKYLIGHTS $4,672 $35,090 Implemented
NC0164 # 01 Y:1999 01 1999 ADJUST BURNERS FOR EFFICIENT OPERATION $8,380 $700 Implemented
TN0654 # 01 Y:1999 01 1999 BURN A LESS EXPENSIVE GRADE OF FUEL $144,460 $25,120 Implemented