IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

178

matching recommendations
Reset
SIC 2951 Asphalt Paving Mixtures And Blocks
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LS2214 # 04 Y:2022 04 2022 INSTALL TIMERS AND/OR THERMOSTATS $217 $38 Implemented
LS2214 # 05 Y:2022 05 2022 LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT $53,187 $50,000 Implemented
LS2214 # 01 Y:2022 01 2022 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $137 $0 Implemented
LS2214 # 02 Y:2022 02 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,189 $270 Implemented
AS0488 # 01 Y:2020 01 2020 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $118,609 $10,790 Implemented
AS0488 # 03 Y:2020 03 2020 ELIMINATE LEAKS IN WATER LINES AND VALVES $2,602 $272 Implemented
AS0488 # 04 Y:2020 04 2020 INSTALL HEAT PIPES / RAISE COOLING SETPOINT $2,344 $36 Implemented
AS0488 # 05 Y:2020 05 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,864 $7,653 Implemented
CL1912 # 03 Y:2019 03 2019 INSULATE BARE EQUIPMENT $5,433 $15,806 Implemented
SF0545 # 06 Y:2019 06 2019 USE SOLAR HEAT TO MAKE ELECTRICTY $238,757 $1,300,334 Implemented
SF0545 # 03 Y:2019 03 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,924 $11,386 Implemented
CL1912 # 04 Y:2019 04 2019 PAY UTILITY BILLS ON TIME $103 $0 Implemented
CL1912 # 02 Y:2019 02 2019 MINIMIZE WATER USAGE $1,166 $1,750 Implemented
CL1912 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,757 $4,162 Implemented
SF0545 # 01 Y:2019 01 2019 INSULATE BARE EQUIPMENT $1,151 $1,194 Implemented
OR0715 # 03 Y:2019 03 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,204 $0 Implemented
OR0715 # 04 Y:2019 04 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $948 $0 Implemented
MA0785 # 01 Y:2017 01 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,893 $20,000 Implemented
MA0785 # 03 Y:2017 03 2017 KEEP BOILER TUBES CLEAN $1,014 $1,200 Implemented
OR0680 # 01 Y:2017 01 2017 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $45,000 $66,392 Implemented
OR0680 # 04 Y:2017 04 2017 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,732 $3,529 Implemented
OR0680 # 03 Y:2017 03 2017 ADJUST BURNERS FOR EFFICIENT OPERATION $2,467 $1,000 Implemented
MI0249 # 03 Y:2013 03 2013 INCREASE EFFICIENCY OF TRUCKS $14,224 $11,600 Implemented
MI0249 # 01 Y:2013 01 2013 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS $1,845,922 $2,000,000 Implemented
MI0249 # 08 Y:2013 08 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,904 $80 Implemented