IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

281

matching recommendations
Reset
SIC 2952 Asphalt Felts And Coatings
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0871 # 08 Y:2023 08 2023 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $3,600 $2,000 Implemented
AM0871 # 10 Y:2023 10 2023 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $525 $0 Implemented
AM0871 # 09 Y:2023 09 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $694 $588 Implemented
AM0871 # 07 Y:2023 07 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,880 $2,700 Implemented
AM0871 # 06 Y:2023 06 2023 INSTALL OCCUPANCY SENSORS $1,890 $3,600 Implemented
AM0871 # 05 Y:2023 05 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,678 $1,280 Implemented
AM0871 # 01 Y:2023 01 2023 INSULATE BARE EQUIPMENT $7,430 $10,320 Implemented
AM0871 # 04 Y:2023 04 2023 USE SYNTHETIC LUBRICANT $3,265 $500 Implemented
AM0871 # 02 Y:2023 02 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,840 $30 Implemented
MA0846 # 05 Y:2023 05 2023 INSTALL OCCUPANCY SENSORS $1,483 $4,908 Implemented
MA0846 # 04 Y:2023 04 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,290 $625 Implemented
SD0604 # 04 Y:2020 04 2020 TURN OFF EQUIPMENT WHEN NOT IN USE $9,562 $3,960 Implemented
SD0604 # 02 Y:2020 02 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,064 $0 Implemented
SD0604 # 01 Y:2020 01 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18,750 $1,200 Implemented
UF0523 # 06 Y:2019 06 2019 INSTALL / REPAIR INSULATION ON STEAM LINES $2,925 $1,308 Implemented
UF0523 # 04 Y:2019 04 2019 REPAIR AND ELIMINATE STEAM LEAKS $14,533 $1,600 Implemented
UF0523 # 05 Y:2019 05 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,991 $4,959 Implemented
OK1002 # 03 Y:2019 03 2019 RECOVER WASTE HEAT FROM EQUIPMENT $2,400 $2,933 Implemented
OK1002 # 04 Y:2019 04 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,768 $3,646 Implemented
OK1002 # 02 Y:2019 02 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,343 $2,609 Implemented
OK1002 # 06 Y:2019 06 2019 INSTALL SET-BACK TIMERS $1,083 $802 Implemented
OK1001 # 02 Y:2019 02 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,799 $3,509 Implemented
OR0703 # 05 Y:2018 05 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,955 $4,730 Implemented
OR0703 # 03 Y:2018 03 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,525 $8,125 Implemented
OR0703 # 02 Y:2018 02 2018 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $7,797 $13,333 Implemented