IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

27

matching recommendations
Reset
SIC 2952 Asphalt Felts And Coatings
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0701 # 04 Y:2015 04 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,230 $2,460 Implemented
CO0701 # 03 Y:2015 03 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,920 $3,750 Implemented
CO0701 # 02 Y:2015 02 2015 INSULATE BARE EQUIPMENT $19,610 $20,000 Implemented
CO0637 # 04 Y:2010 04 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $23,650 $20,950 Implemented
CO0637 # 03 Y:2010 03 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,200 $460 Implemented
CO0637 # 01 Y:2010 01 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,860 $24,000 Implemented
CO0580 # 11 Y:2006 11 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $280 $500 Implemented
CO0580 # 09 Y:2006 09 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $660 $1,830 Implemented
CO0580 # 07 Y:2006 07 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $50 $20 Implemented
CO0580 # 05 Y:2006 05 2006 DIRECT WARMEST AIR TO COMBUSTION INTAKE $3,310 $980 Implemented
CO0580 # 04 Y:2006 04 2006 INCREASE AMOUNT OF CONDENSATE RETURNED $3,750 $12,850 Implemented
CO0580 # 02 Y:2006 02 2006 REPAIR AND ELIMINATE STEAM LEAKS $10,650 $500 Implemented
CO0411 # 06 Y:1998 06 1998 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $26,243 $21,600 Implemented
CO0411 # 08 Y:1998 08 1998 INSTALL AUTOMATIC PACKING EQUIPMENT $143,520 $17,500 Implemented
CO0411 # 04 Y:1998 04 1998 USE IN-PROCESS RECYCLING WHENEVER POSSIBLE $102,860 $72,000 Implemented
CO0411 # 02 Y:1998 02 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,480 $100 Implemented
CO0411 # 01 Y:1998 01 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $290 $523 Implemented
CO0083 # 11 Y:1987 11 1987 INSTALL SET-BACK TIMERS $552 $395 Implemented
CO0083 # 08 Y:1987 08 1987 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $333 $900 Implemented
CO0083 # 06 Y:1987 06 1987 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $302 $500 Implemented
CO0083 # 05 Y:1987 05 1987 REPAIR AND ELIMINATE STEAM LEAKS $2,812 $500 Implemented
CO0083 # 04 Y:1987 04 1987 INSULATE BARE EQUIPMENT $1,718 $1,000 Implemented
CO0083 # 02 Y:1987 02 1987 INSTALL TURBULATORS $4,207 $1,200 Implemented
CO0083 # 01 Y:1987 01 1987 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $6,881 $300 Implemented
CO0069 # 03 Y:1986 03 1986 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $8,322 $300 Implemented