IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,818

matching recommendations
Reset
SIC 30 Rubber And Miscellaneous Plastics Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0248 # 02 Y:2002 02 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $934 $34 Implemented
WV0248 # 03 Y:2002 03 2002 USE OPTIMUM THICKNESS INSULATION $5,194 $840 Implemented
WV0248 # 04 Y:2002 04 2002 INSULATE BARE EQUIPMENT $10,209 $316 Implemented
WV0248 # 05 Y:2002 05 2002 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $14,097 $340 Implemented
WV0248 # 06 Y:2002 06 2002 INSTALL OCCUPANCY SENSORS $1,454 $600 Implemented
WV0248 # 07 Y:2002 07 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $7,421 $850 Implemented
WV0248 # 08 Y:2002 08 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $534 $1,660 Implemented
WV0248 # 10 Y:2002 10 2002 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $8,295 $0 Implemented
WV0248 # 11 Y:2002 11 2002 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $233 $34 Implemented
WV0248 # 12 Y:2002 12 2002 CLEAR AND RENT EXISTING SPACE $4,000 $670 Implemented
LL0146 # 01 Y:2002 01 2002 OPTIMIZE PLANT POWER FACTOR $6,310 $10,850 Implemented
LL0146 # 02 Y:2002 02 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,890 $2,580 Implemented
LL0146 # 07 Y:2002 07 2002 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $1,720 $2,400 Implemented
UD0651 # 01 Y:2002 01 2002 DEVELOP STANDARD OPERATING PROCEDURES $165,000 $0 Implemented
UD0651 # 02 Y:2002 02 2002 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $37,254 $5,000 Implemented
UD0651 # 03 Y:2002 03 2002 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $23,217 $0 Implemented
UD0651 # 04 Y:2002 04 2002 OPTIMIZE PLANT POWER FACTOR $19,136 $24,000 Implemented
UD0651 # 07 Y:2002 07 2002 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $7,528 $0 Implemented
UD0651 # 08 Y:2002 08 2002 TURN OFF EQUIPMENT WHEN NOT IN USE $5,833 $1,125 Implemented
UD0651 # 09 Y:2002 09 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $751 $1,737 Implemented
UD0651 # 10 Y:2002 10 2002 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $313 $0 Implemented
MA0517 # 01 Y:2002 01 2002 COVER OPEN TANKS $30,107 $4,262 Implemented
MA0517 # 03 Y:2002 03 2002 USE MINIMUM SAFE OVEN VENTILATION $7,427 $2,100 Implemented
MA0517 # 04 Y:2002 04 2002 PAY BILLS ON TIME TO AVOID LATE FEES $6,528 $0 Implemented
MA0517 # 05 Y:2002 05 2002 INSULATE BARE EQUIPMENT $6,349 $9,636 Implemented