Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
7,818
matching recommendationsSIC | 30 | Rubber And Miscellaneous Plastics Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AM0384 # 02 Y:2001 | 02 | 2001 | LOWER LIGHT FIXTURES IN HIGH CEILING AREAS | $6,630 | $8,810 | Implemented |
AM0384 # 03 Y:2001 | 03 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,900 | $250 | Implemented |
AM0384 # 05 Y:2001 | 05 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,395 | $20 | Implemented |
SF0206 # 04 Y:2001 | 04 | 2001 | INSTALL OCCUPANCY SENSORS | $668 | $600 | Implemented |
SF0206 # 07 Y:2001 | 07 | 2001 | INSTALL OCCUPANCY SENSORS | $4,060 | $22,250 | Implemented |
MA0479 # 01 Y:2000 | 01 | 2000 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $7,300 | $3,000 | Implemented |
MA0479 # 02 Y:2000 | 02 | 2000 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $6,900 | $8,400 | Implemented |
MA0479 # 03 Y:2000 | 03 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,310 | $550 | Implemented |
MA0479 # 05 Y:2000 | 05 | 2000 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $930 | $0 | Implemented |
MA0479 # 06 Y:2000 | 06 | 2000 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $750 | $1,250 | Implemented |
ND0365 # 02 Y:2000 | 02 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $897 | $120 | Implemented |
SF0205 # 01 Y:2000 | 01 | 2000 | SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS | $2,248 | $0 | Implemented |
SF0205 # 02 Y:2000 | 02 | 2000 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,267 | $781 | Implemented |
SF0205 # 03 Y:2000 | 03 | 2000 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,398 | $1,128 | Implemented |
SF0205 # 04 Y:2000 | 04 | 2000 | INSULATE BARE EQUIPMENT | $4,536 | $4,508 | Implemented |
SF0205 # 05 Y:2000 | 05 | 2000 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $8,404 | $9,230 | Implemented |
SF0205 # 06 Y:2000 | 06 | 2000 | INSTALL OCCUPANCY SENSORS | $1,007 | $1,080 | Implemented |
SF0205 # 07 Y:2000 | 07 | 2000 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $568 | $750 | Implemented |
SF0205 # 08 Y:2000 | 08 | 2000 | INSTALL OCCUPANCY SENSORS | $4,509 | $7,290 | Implemented |
MA0473 # 01 Y:2000 | 01 | 2000 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $28,890 | $140,000 | Implemented |
MA0473 # 02 Y:2000 | 02 | 2000 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $24,924 | $129,000 | Implemented |
MA0473 # 03 Y:2000 | 03 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,760 | $1,200 | Implemented |
MA0473 # 04 Y:2000 | 04 | 2000 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $5,180 | $0 | Implemented |
MA0473 # 05 Y:2000 | 05 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,269 | $350 | Implemented |
MA0473 # 06 Y:2000 | 06 | 2000 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,779 | $7,000 | Implemented |