Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
7,818
matching recommendationsSIC | 30 | Rubber And Miscellaneous Plastics Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0522 # 02 Y:1997 | 02 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $647 | $2,000 | Implemented |
UD0522 # 03 Y:1997 | 03 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,104 | $16,862 | Implemented |
UD0522 # 05 Y:1997 | 05 | 1997 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $22,129 | $4,000 | Implemented |
UD0523 # 01 Y:1997 | 01 | 1997 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $34,683 | $0 | Implemented |
UD0523 # 02 Y:1997 | 02 | 1997 | REVISE RAW MATERIAL SPECS | $203,890 | $100,000 | Implemented |
SD0179 # 01 Y:1997 | 01 | 1997 | REPLACE BOILER | $8,920 | $15,000 | Implemented |
SD0179 # 02 Y:1997 | 02 | 1997 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,564 | $350 | Implemented |
SD0179 # 03 Y:1997 | 03 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,715 | $11,208 | Implemented |
SD0179 # 04 Y:1997 | 04 | 1997 | INSTALL SPECTRAL REFLECTORS / DELAMP | $4,501 | $3,940 | Implemented |
SD0179 # 05 Y:1997 | 05 | 1997 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $6,200 | $9,000 | Implemented |
SD0179 # 06 Y:1997 | 06 | 1997 | RECOVER AND REUSE WASTE MATERIAL | $2,550 | $0 | Implemented |
SD0179 # 08 Y:1997 | 08 | 1997 | WASH AND REUSE RAGS ON-SITE | $11,710 | $1,000 | Implemented |
SD0179 # 09 Y:1997 | 09 | 1997 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $14,500 | $5,000 | Implemented |
SD0178 # 01 Y:1997 | 01 | 1997 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $7,361 | $6,880 | Implemented |
SD0178 # 02 Y:1997 | 02 | 1997 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $6,487 | $7,800 | Implemented |
SD0178 # 03 Y:1997 | 03 | 1997 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,849 | $100 | Implemented |
SD0178 # 04 Y:1997 | 04 | 1997 | USE OPTIMUM THICKNESS INSULATION | $2,400 | $2,250 | Implemented |
SD0178 # 05 Y:1997 | 05 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,073 | $4,231 | Implemented |
SD0178 # 06 Y:1997 | 06 | 1997 | INSTALL SPECTRAL REFLECTORS / DELAMP | $1,663 | $955 | Implemented |
SD0178 # 07 Y:1997 | 07 | 1997 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $11,800 | $6,000 | Implemented |
SD0178 # 08 Y:1997 | 08 | 1997 | CONVERT TO LESS TOXIC HYDROCARBON CLEANERS | $12,985 | $0 | Implemented |
SD0178 # 09 Y:1997 | 09 | 1997 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $3,620 | $9,000 | Implemented |
SD0178 # 10 Y:1997 | 10 | 1997 | MODIFY MATERIAL APPLICATION METHODS | $1,620 | $2,600 | Implemented |
SD0178 # 12 Y:1997 | 12 | 1997 | INSTALL AUTOMATIC PACKING EQUIPMENT | $75,000 | $20,000 | Implemented |
UD0521 # 01 Y:1997 | 01 | 1997 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $7,099 | $0 | Implemented |