IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,818

matching recommendations
Reset
SIC 30 Rubber And Miscellaneous Plastics Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AR0079 # 03 Y:1996 03 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,788 $100 Implemented
AR0079 # 04 Y:1996 04 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,148 $110 Implemented
AR0079 # 05 Y:1996 05 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,725 $6,180 Implemented
AR0079 # 07 Y:1996 07 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,187 $160 Implemented
AR0079 # 09 Y:1996 09 1996 MINIMIZE WATER USAGE $8 $10 Implemented
UM0047 # 02 Y:1996 02 1996 OPTIMIZE PLANT POWER FACTOR $2,253 $4,880 Implemented
UM0047 # 04 Y:1996 04 1996 USE SYNTHETIC LUBRICANT $471 $256 Implemented
WV0087 # 01 Y:1996 01 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,024 $1,580 Implemented
WV0087 # 02 Y:1996 02 1996 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $327 $160 Implemented
WV0087 # 04 Y:1996 04 1996 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $825 $300 Implemented
WV0087 # 07 Y:1996 07 1996 INSULATE BARE EQUIPMENT $7,466 $1,085 Implemented
SF0084 # 01 Y:1996 01 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $606 $464 Implemented
SF0084 # 02 Y:1996 02 1996 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,317 $2,110 Implemented
SF0084 # 03 Y:1996 03 1996 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $981 $810 Implemented
NC0084 # 01 Y:1996 01 1996 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $20,895 $10,000 Implemented
NC0084 # 02 Y:1996 02 1996 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,441 $3,000 Implemented
NC0084 # 03 Y:1996 03 1996 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $9,833 $400 Implemented
NC0084 # 04 Y:1996 04 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,498 $1,700 Implemented
NC0084 # 08 Y:1996 08 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,827 $2,970 Implemented
NC0084 # 09 Y:1996 09 1996 INSULATE BARE EQUIPMENT $932 $549 Implemented
NC0084 # 11 Y:1996 11 1996 USE DEMAND CONTROLLER OR LOAD SHEDDER $1,960 $2,000 Implemented
NC0084 # 12 Y:1996 12 1996 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $25,015 $18,000 Implemented
AM0266 # 01 Y:1996 01 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,370 $400 Implemented
AM0266 # 02 Y:1996 02 1996 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $390 $0 Implemented
AM0266 # 03 Y:1996 03 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $375 $185 Implemented