IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,818

matching recommendations
Reset
SIC 30 Rubber And Miscellaneous Plastics Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0266 # 04 Y:1996 04 1996 INSULATE BARE EQUIPMENT $360 $710 Implemented
AM0266 # 05 Y:1996 05 1996 ELIMINATE/REDUCE AN OPERATION $2,250 $6,600 Implemented
NV0049 # 03 Y:1996 03 1996 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $1,757 $0 Implemented
NV0049 # 04 Y:1996 04 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $203 $128 Implemented
NV0049 # 05 Y:1996 05 1996 INSTALL OCCUPANCY SENSORS $303 $245 Implemented
NV0049 # 07 Y:1996 07 1996 USE SYNTHETIC LUBRICANT $1,258 $0 Implemented
OR0256 # 01 Y:1996 01 1996 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $2,446 $560 Implemented
OR0256 # 04 Y:1996 04 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $830 $2,626 Implemented
OR0256 # 06 Y:1996 06 1996 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,660 $16,440 Implemented
OR0256 # 07 Y:1996 07 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $576 $6,630 Implemented
NV0048 # 05 Y:1996 05 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,300 $600 Implemented
NV0048 # 07 Y:1996 07 1996 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $394 $25 Implemented
NC0076 # 01 Y:1996 01 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $585 $210 Implemented
NC0076 # 03 Y:1996 03 1996 USE POWER DURING OFF-PEAK PERIODS $5,153 $0 Implemented
DS0046 # 01 Y:1996 01 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,571 $4,376 Implemented
GT0572 # 01 Y:1995 01 1995 REDESIGN PROCESS $7,850 $1,000 Implemented
GT0572 # 02 Y:1995 02 1995 INSTALL / REPAIR INSULATION ON STEAM LINES $2,560 $1,190 Implemented
GT0572 # 05 Y:1995 05 1995 INSTALL SPECTRAL REFLECTORS / DELAMP $3,530 $9,020 Implemented
KG0049 # 01 Y:1996 01 1996 INSULATE BARE EQUIPMENT $16,652 $207 Implemented
KG0049 # 03 Y:1996 03 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $14,214 $12,880 Implemented
KG0049 # 04 Y:1996 04 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,057 $416 Implemented
KG0049 # 05 Y:1996 05 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $248 $300 Implemented
KG0049 # 06 Y:1996 06 1996 TREAT AND REUSE RINSE WATERS $2,707 $3,000 Implemented
KG0049 # 07 Y:1996 07 1996 RECOVER AND REUSE WASTE MATERIAL $44,609 $2,000 Implemented
AM0260 # 03 Y:1996 03 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $870 $330 Implemented