Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
137
matching recommendationsSIC | 30 | Rubber And Miscellaneous Plastics Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MU0044 # 10 Y:2024 | 10 | 2024 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $15,537 | $3,386 | Implemented |
MU0044 # 09 Y:2024 | 09 | 2024 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $362 | $0 | Implemented |
MU0044 # 07 Y:2024 | 07 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,007 | $593 | Implemented |
MU0044 # 06 Y:2024 | 06 | 2024 | INSTALL OCCUPANCY SENSORS | $506 | $138 | Implemented |
MU0044 # 05 Y:2024 | 05 | 2024 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $48 | $0 | Implemented |
MU0044 # 02 Y:2024 | 02 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $493 | $160 | Implemented |
MU0042 # 01 Y:2023 | 01 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,500 | $340 | Implemented |
MU0020 # 10 Y:2022 | 10 | 2022 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $210,000 | $0 | Implemented |
MU0020 # 08 Y:2022 | 08 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,404 | $5,949 | Implemented |
MU0020 # 02 Y:2022 | 02 | 2022 | USE OPTIMUM TEMPERATURE | $226,577 | $176,800 | Implemented |
CW0114 # 04 Y:2020 | 04 | 2020 | USE COMPRESSOR AIR FILTERS | $244 | $95 | Implemented |
CW0114 # 10 Y:2020 | 10 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $356 | $90 | Implemented |
CW0114 # 06 Y:2020 | 06 | 2020 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $1,504 | $0 | Implemented |
CW0114 # 02 Y:2020 | 02 | 2020 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $10,400 | $0 | Implemented |
IC0204 # 05 Y:2018 | 05 | 2018 | TURN OFF EQUIPMENT WHEN NOT IN USE | $21,223 | $0 | Implemented |
IC0204 # 06 Y:2018 | 06 | 2018 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $36,108 | $187,206 | Implemented |
IC0204 # 04 Y:2018 | 04 | 2018 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $71,357 | $8,712 | Implemented |
IC0204 # 03 Y:2018 | 03 | 2018 | REPLACE BOILER | $97,199 | $211,342 | Implemented |
IC0204 # 02 Y:2018 | 02 | 2018 | ADJUST PH FOR NEUTRALIZATION | $132,488 | $180,000 | Implemented |
IC0204 # 01 Y:2018 | 01 | 2018 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $71,958 | $100,000 | Implemented |
UD0981 # 01 Y:2018 | 01 | 2018 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,044 | $0 | Implemented |
UD0981 # 03 Y:2018 | 03 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,028 | $500 | Implemented |
UD0981 # 08 Y:2018 | 08 | 2018 | INSULATE BARE EQUIPMENT | $6,131 | $4,525 | Implemented |
UM0429 # 04 Y:2013 | 04 | 2013 | RECOVER WASTE HEAT FROM EQUIPMENT | $23,321 | $5,000 | Implemented |
UM0429 # 01 Y:2013 | 01 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $34,689 | $59,040 | Implemented |