Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
71
matching recommendationsSIC | 30 | Rubber And Miscellaneous Plastics Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0848 # 04 Y:2023 | 04 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,130 | $26,000 | Implemented |
MA0848 # 03 Y:2023 | 03 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $14,335 | $15,950 | Implemented |
MA0814 # 04 Y:2020 | 04 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,788 | $12,100 | Implemented |
MA0814 # 05 Y:2020 | 05 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,694 | $12,100 | Implemented |
MA0814 # 06 Y:2020 | 06 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,857 | $4,096 | Implemented |
MAS021 # 06 Y:2012 | 06 | 2012 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $3,590 | $3,120 | Implemented |
MAS021 # 05 Y:2012 | 05 | 2012 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $4,883 | $3,120 | Implemented |
MAS021 # 04 Y:2012 | 04 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $8,077 | $8,000 | Implemented |
MA0649 # 04 Y:2009 | 04 | 2009 | INSTALL OCCUPANCY SENSORS | $2,945 | $3,000 | Implemented |
MA0582 # 04 Y:2005 | 04 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $14,153 | $0 | Implemented |
MA0582 # 08 Y:2005 | 08 | 2005 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $6,340 | $25,150 | Implemented |
MA0582 # 10 Y:2005 | 10 | 2005 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $1,584 | $1,300 | Implemented |
MA0582 # 07 Y:2005 | 07 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,815 | $7,660 | Implemented |
MA0582 # 09 Y:2005 | 09 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,540 | $800 | Implemented |
MA0582 # 06 Y:2005 | 06 | 2005 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $7,599 | $2,010 | Implemented |
MA0582 # 03 Y:2005 | 03 | 2005 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $15,630 | $6,540 | Implemented |
MA0582 # 02 Y:2005 | 02 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $37,163 | $86,315 | Implemented |
MA0581 # 08 Y:2005 | 08 | 2005 | RECOVER WASTE HEAT FROM EQUIPMENT | $10,675 | $4,675 | Implemented |
MA0581 # 09 Y:2005 | 09 | 2005 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $9,508 | $160 | Implemented |
MA0581 # 02 Y:2005 | 02 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $81,700 | $18,200 | Implemented |
MA0581 # 04 Y:2005 | 04 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $30,652 | $18,550 | Implemented |
MA0581 # 07 Y:2005 | 07 | 2005 | ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF | $10,812 | $5,328 | Implemented |
MA0581 # 10 Y:2005 | 10 | 2005 | ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF | $5,166 | $3,100 | Implemented |
MA0581 # 11 Y:2005 | 11 | 2005 | USE COOLING TOWER WATER INSTEAD OF REFRIGERATION | $3,467 | $8,300 | Implemented |
MA0561 # 04 Y:2004 | 04 | 2004 | REDUCE VENTILATION AIR | $6,815 | $4,530 | Implemented |