IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

30

matching recommendations
Reset
SIC 30 Rubber And Miscellaneous Plastics Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0219 # 02 Y:2023 02 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,112 $13,345 Implemented
UU0214 # 03 Y:2023 03 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $2,776 $6,969 Implemented
UU0214 # 02 Y:2023 02 2023 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $4,069 $17,638 Implemented
UU0214 # 01 Y:2023 01 2023 OPTIMIZE PLANT POWER FACTOR $14,031 $23,302 Implemented
UU0214 # 04 Y:2023 04 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,274 $495 Implemented
UU0214 # 06 Y:2023 06 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $550 $1,558 Implemented
UU0185 # 07 Y:2021 07 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $491 $255 Implemented
UU0185 # 04 Y:2021 04 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,525 $11,563 Implemented
UU0185 # 03 Y:2021 03 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,814 $14,000 Implemented
UU0185 # 02 Y:2021 02 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $6,198 $3,400 Implemented
UU0150 # 01 Y:2019 01 2019 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $20,467 $29,138 Implemented
UU0150 # 02 Y:2019 02 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,018 $6,202 Implemented
UU0150 # 06 Y:2019 06 2019 OPTIMIZE PLANT POWER FACTOR $5,042 $5,250 Implemented
UU0150 # 07 Y:2019 07 2019 TURN OFF EQUIPMENT WHEN NOT IN USE $3,861 $0 Implemented
UU0150 # 10 Y:2019 10 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,768 $1,756 Implemented
UU0150 # 11 Y:2019 11 2019 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $1,570 $1,000 Implemented
UU0152 # 02 Y:2019 02 2019 RECOVER AND REUSE WASTE MATERIAL $12,915 $9,000 Implemented
UU0152 # 08 Y:2019 08 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,208 $231 Implemented
UU0152 # 06 Y:2019 06 2019 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $1,817 $3,415 Implemented
UU0152 # 04 Y:2019 04 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,593 $32,661 Implemented
UU0152 # 03 Y:2019 03 2019 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $10,938 $2,000 Implemented
UU0144 # 04 Y:2019 04 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,420 $128 Implemented
UU0144 # 02 Y:2019 02 2019 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $16,349 $400 Implemented
UU0144 # 01 Y:2019 01 2019 INSULATE BARE EQUIPMENT $42,296 $1,068 Implemented
UU0122 # 04 Y:2017 04 2017 UPGRADE CONTROLS ON COMPRESSORS $7,349 $800 Implemented