IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

345

matching recommendations
Reset
SIC 3053 Gaskets, Packing And Sealing Devices
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0318 # 06 Y:2003 06 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $739 $300 Implemented
AM0418 # 01 Y:2002 01 2002 REPAIR OR REPLACE STEAM TRAPS $33,700 $4,735 Implemented
AM0418 # 02 Y:2002 02 2002 INSTALL EQUIPMENT TO MOVE PRODUCT $20,000 $6,000 Implemented
AM0418 # 03 Y:2002 03 2002 REPAIR AND ELIMINATE STEAM LEAKS $9,500 $200 Implemented
AM0418 # 06 Y:2002 06 2002 REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS $1,650 $1,080 Implemented
AM0418 # 08 Y:2002 08 2002 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,400 $140 Implemented
AM0418 # 10 Y:2002 10 2002 PAY UTILITY BILLS ON TIME $1,008 $0 Implemented
IA0287 # 01 Y:2002 01 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,719 $452 Implemented
IA0287 # 04 Y:2002 04 2002 RECOVER WASTE HEAT FROM EQUIPMENT $7,641 $10,125 Implemented
IA0287 # 05 Y:2002 05 2002 ADJUST BURNERS FOR EFFICIENT OPERATION $337 $400 Implemented
IA0287 # 07 Y:2002 07 2002 INCREASE USE OF AUTOMATION $112,320 $132,000 Implemented
SU0132 # 02 Y:2002 02 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $6,727 $8,057 Implemented
SU0132 # 03 Y:2002 03 2002 INSTALL TIMERS AND/OR THERMOSTATS $5,704 $472 Implemented
SU0132 # 04 Y:2002 04 2002 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $5,586 $392 Implemented
SU0132 # 05 Y:2002 05 2002 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,123 $0 Implemented
SU0132 # 09 Y:2002 09 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $154 $0 Implemented
SD0270 # 01 Y:2001 01 2001 REDESIGN PROCESS $182,520 $35,000 Implemented
SD0270 # 02 Y:2001 02 2001 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $21,642 $15,000 Implemented
SD0270 # 03 Y:2001 03 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $23,189 $800 Implemented
SD0270 # 05 Y:2001 05 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $27,077 $36,000 Implemented
SD0270 # 06 Y:2001 06 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $51,823 $103,000 Implemented
SD0270 # 07 Y:2001 07 2001 INSTALL SKYLIGHTS $7,878 $12,500 Implemented
SD0270 # 09 Y:2001 09 2001 RECOVER AND REUSE WASTE MATERIAL $32,522 $5,000 Implemented
SD0270 # 10 Y:2001 10 2001 MINIMIZE CONTAMINATION OF WATER BEFORE TREATMENT $3,170 $1,500 Implemented
SD0270 # 11 Y:2001 11 2001 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES $648 $0 Implemented