Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
986
matching recommendationsSIC | 306 | Fabricated Rubber Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
GT0629 # 07 Y:1997 | 07 | 1997 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $5,680 | $900 | Implemented |
AR0124 # 01 Y:1997 | 01 | 1997 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $757 | $120 | Implemented |
AR0124 # 04 Y:1997 | 04 | 1997 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $2,617 | $100 | Implemented |
AR0124 # 05 Y:1997 | 05 | 1997 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,903 | $0 | Implemented |
AR0124 # 06 Y:1997 | 06 | 1997 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $376 | $100 | Implemented |
AR0124 # 07 Y:1997 | 07 | 1997 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,103 | $1,238 | Implemented |
AR0124 # 08 Y:1997 | 08 | 1997 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $950 | $100 | Implemented |
MS0096 # 01 Y:1997 | 01 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,195 | $7,228 | Implemented |
MS0096 # 02 Y:1997 | 02 | 1997 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $13,603 | $17,448 | Implemented |
MS0096 # 03 Y:1997 | 03 | 1997 | DISTILL CONTAMINATED SOLVENTS FOR REUSE | $19,264 | $5,738 | Implemented |
UD0523 # 01 Y:1997 | 01 | 1997 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $34,683 | $0 | Implemented |
UD0523 # 02 Y:1997 | 02 | 1997 | REVISE RAW MATERIAL SPECS | $203,890 | $100,000 | Implemented |
DS0097 # 01 Y:1997 | 01 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,061 | $6,939 | Implemented |
DS0097 # 02 Y:1997 | 02 | 1997 | INSTALL OCCUPANCY SENSORS | $509 | $300 | Implemented |
DS0097 # 03 Y:1997 | 03 | 1997 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $529 | $172 | Implemented |
DS0097 # 07 Y:1997 | 07 | 1997 | FILTER AND REUSE HYDRAULIC OIL | $1,905 | $0 | Implemented |
DS0097 # 08 Y:1997 | 08 | 1997 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $39,621 | $9,000 | Implemented |
WV0119 # 02 Y:1997 | 02 | 1997 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,860 | $345 | Implemented |
WV0119 # 03 Y:1997 | 03 | 1997 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,490 | $350 | Implemented |
WV0119 # 05 Y:1997 | 05 | 1997 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $617 | $500 | Implemented |
WV0119 # 06 Y:1997 | 06 | 1997 | REPAIR AND ELIMINATE STEAM LEAKS | $3,700 | $1,200 | Implemented |
WV0119 # 09 Y:1997 | 09 | 1997 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $7,136 | $16,305 | Implemented |
WV0119 # 10 Y:1997 | 10 | 1997 | CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | $137,441 | $16,000 | Implemented |
WV0119 # 12 Y:1997 | 12 | 1997 | INSTALL SHELVES / RACKS TO UTILIZE UNUSED SPACE | $11,020 | $30,000 | Implemented |
TN0605 # 01 Y:1997 | 01 | 1997 | INSTALL EQUIPMENT TO MOVE PRODUCT | $104,110 | $129,700 | Implemented |