Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
34
matching recommendationsSIC | 306 | Fabricated Rubber Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0436 # 02 Y:1999 | 02 | 1999 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $24,170 | $27,774 | Implemented |
MA0436 # 07 Y:1999 | 07 | 1999 | DISCONNECT BALLASTS | $60 | $100 | Implemented |
MA0436 # 06 Y:1999 | 06 | 1999 | INSTALL OCCUPANCY SENSORS | $148 | $77 | Implemented |
MA0436 # 03 Y:1999 | 03 | 1999 | MODERATE COOLING TOWER OUTLET TEMPERATURE | $7,745 | $12,435 | Implemented |
MA0335 # 09 Y:1995 | 09 | 1995 | COMBINE UTILITY METERS | $300 | $0 | Implemented |
MA0335 # 01 Y:1995 | 01 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,545 | $5,433 | Implemented |
MA0335 # 08 Y:1995 | 08 | 1995 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $318 | $0 | Implemented |
MA0335 # 03 Y:1995 | 03 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,352 | $1,790 | Implemented |
MA0335 # 04 Y:1995 | 04 | 1995 | OPERATE BOILERS ON HIGH FIRE SETTING | $662 | $400 | Implemented |
MA0308 # 04 Y:1994 | 04 | 1994 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $441 | $110 | Implemented |
MA0308 # 02 Y:1994 | 02 | 1994 | REPAIR OR REPLACE STEAM TRAPS | $19,471 | $813 | Implemented |
MA0308 # 01 Y:1994 | 01 | 1994 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $87,650 | $18,145 | Implemented |
MA0228 # 06 Y:1991 | 06 | 1991 | INSULATE BARE EQUIPMENT | $458 | $430 | Implemented |
MA0228 # 05 Y:1991 | 05 | 1991 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $891 | $400 | Implemented |
MA0228 # 03 Y:1991 | 03 | 1991 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,534 | $2,000 | Implemented |
MA0228 # 02 Y:1991 | 02 | 1991 | USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE | $8,647 | $5,000 | Implemented |
MA0179 # 02 Y:1990 | 02 | 1990 | RECOVER AND REUSE COOLING WATER | $10,670 | $8,250 | Implemented |
MA0179 # 04 Y:1990 | 04 | 1990 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $554 | $70 | Implemented |
MA0071 # 04 Y:1986 | 04 | 1986 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $27,051 | $2,280 | Implemented |
MA0072 # 05 Y:1986 | 05 | 1986 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $9,992 | $6,740 | Implemented |
MA0072 # 04 Y:1986 | 04 | 1986 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $9,691 | $720 | Implemented |
MA0072 # 03 Y:1986 | 03 | 1986 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $34,923 | $1,500 | Implemented |
MA0072 # 02 Y:1986 | 02 | 1986 | REPAIR OR REPLACE STEAM TRAPS | $13,251 | $600 | Implemented |
MA0071 # 08 Y:1986 | 08 | 1986 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $3,104 | $6,688 | Implemented |
MA0071 # 02 Y:1986 | 02 | 1986 | INSULATE BARE EQUIPMENT | $13,827 | $2,280 | Implemented |