IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

34

matching recommendations
Reset
SIC 306 Fabricated Rubber Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0436 # 02 Y:1999 02 1999 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $24,170 $27,774 Implemented
MA0436 # 07 Y:1999 07 1999 DISCONNECT BALLASTS $60 $100 Implemented
MA0436 # 06 Y:1999 06 1999 INSTALL OCCUPANCY SENSORS $148 $77 Implemented
MA0436 # 03 Y:1999 03 1999 MODERATE COOLING TOWER OUTLET TEMPERATURE $7,745 $12,435 Implemented
MA0335 # 09 Y:1995 09 1995 COMBINE UTILITY METERS $300 $0 Implemented
MA0335 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,545 $5,433 Implemented
MA0335 # 08 Y:1995 08 1995 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $318 $0 Implemented
MA0335 # 03 Y:1995 03 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,352 $1,790 Implemented
MA0335 # 04 Y:1995 04 1995 OPERATE BOILERS ON HIGH FIRE SETTING $662 $400 Implemented
MA0308 # 04 Y:1994 04 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $441 $110 Implemented
MA0308 # 02 Y:1994 02 1994 REPAIR OR REPLACE STEAM TRAPS $19,471 $813 Implemented
MA0308 # 01 Y:1994 01 1994 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $87,650 $18,145 Implemented
MA0228 # 06 Y:1991 06 1991 INSULATE BARE EQUIPMENT $458 $430 Implemented
MA0228 # 05 Y:1991 05 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $891 $400 Implemented
MA0228 # 03 Y:1991 03 1991 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,534 $2,000 Implemented
MA0228 # 02 Y:1991 02 1991 USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE $8,647 $5,000 Implemented
MA0179 # 02 Y:1990 02 1990 RECOVER AND REUSE COOLING WATER $10,670 $8,250 Implemented
MA0179 # 04 Y:1990 04 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $554 $70 Implemented
MA0071 # 04 Y:1986 04 1986 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $27,051 $2,280 Implemented
MA0072 # 05 Y:1986 05 1986 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $9,992 $6,740 Implemented
MA0072 # 04 Y:1986 04 1986 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $9,691 $720 Implemented
MA0072 # 03 Y:1986 03 1986 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $34,923 $1,500 Implemented
MA0072 # 02 Y:1986 02 1986 REPAIR OR REPLACE STEAM TRAPS $13,251 $600 Implemented
MA0071 # 08 Y:1986 08 1986 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $3,104 $6,688 Implemented
MA0071 # 02 Y:1986 02 1986 INSULATE BARE EQUIPMENT $13,827 $2,280 Implemented