IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

231

matching recommendations
Reset
SIC 3061 Mechanical Rubber Goods
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0438 # 04 Y:2003 04 2003 RECOVER WASTE HEAT FROM EQUIPMENT $1,901 $1,000 Implemented
WI0438 # 05 Y:2003 05 2003 INSTALL TIMERS AND/OR THERMOSTATS $1,793 $2,800 Implemented
WI0438 # 06 Y:2003 06 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $353 $120 Implemented
UM0224 # 03 Y:2003 03 2003 OPTIMIZE PLANT POWER FACTOR $21,643 $15,930 Implemented
UM0224 # 04 Y:2003 04 2003 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $51,840 $5,520 Implemented
UM0224 # 05 Y:2003 05 2003 REPAIR AND ELIMINATE STEAM LEAKS $26,100 $7,230 Implemented
UM0224 # 07 Y:2003 07 2003 INSTALL / REPAIR INSULATION ON STEAM LINES $2,606 $934 Implemented
UM0224 # 09 Y:2003 09 2003 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $2,650 $120 Implemented
UM0224 # 12 Y:2003 12 2003 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $31,000 $2,500 Implemented
SF0245 # 03 Y:2002 03 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,576 $4,115 Implemented
SF0245 # 04 Y:2002 04 2002 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $8,585 $20,725 Implemented
SF0245 # 06 Y:2002 06 2002 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $2,738 $6,972 Implemented
SF0245 # 07 Y:2002 07 2002 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,193 $0 Implemented
HO0238 # 03 Y:2000 03 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $702 $60 Implemented
HO0238 # 04 Y:2000 04 2000 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,736 $1,200 Implemented
HO0238 # 05 Y:2000 05 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,502 $600 Implemented
HO0238 # 06 Y:2000 06 2000 $840 $200 Implemented
HO0238 # 07 Y:2000 07 2000 $840 $250 Implemented
HO0238 # 08 Y:2000 08 2000 $1,220 $40 Implemented
IA0233 # 03 Y:1999 03 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $139 $45 Implemented
IA0233 # 05 Y:1999 05 1999 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $6,757 $2,000 Implemented
SD0234 # 04 Y:1999 04 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,069 $1,425 Implemented
MA0436 # 02 Y:1999 02 1999 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $24,170 $27,774 Implemented
MA0436 # 03 Y:1999 03 1999 MODERATE COOLING TOWER OUTLET TEMPERATURE $7,745 $12,435 Implemented
MA0436 # 06 Y:1999 06 1999 INSTALL OCCUPANCY SENSORS $148 $77 Implemented