Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
749
matching recommendationsSIC | 3069 | Fabricated Rubber Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0273 # 10 Y:2003 | 10 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $166 | $45 | Implemented |
OK0658 # 01 Y:2003 | 01 | 2003 | UPGRADE CONTROLS ON COMPRESSORS | $51,704 | $45,000 | Implemented |
OK0658 # 03 Y:2003 | 03 | 2003 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $11,031 | $0 | Implemented |
OK0658 # 04 Y:2003 | 04 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,978 | $367 | Implemented |
OK0658 # 05 Y:2003 | 05 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,150 | $5,273 | Implemented |
OK0658 # 08 Y:2003 | 08 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,609 | $30,876 | Implemented |
OK0658 # 09 Y:2003 | 09 | 2003 | INSTALL OCCUPANCY SENSORS | $6,270 | $2,004 | Implemented |
IC0054 # 01 Y:2003 | 01 | 2003 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $358 | $1,074 | Implemented |
MA0526 # 07 Y:2003 | 07 | 2003 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,169 | $0 | Implemented |
AS0336 # 04 Y:2002 | 04 | 2002 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $418 | $30 | Implemented |
AS0336 # 06 Y:2002 | 06 | 2002 | REUSE / RECYCLE/ SELL PAPER PRODUCTS | $9,360 | $40 | Implemented |
AS0336 # 08 Y:2002 | 08 | 2002 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS | $72,604 | $3,840 | Implemented |
AS0336 # 09 Y:2002 | 09 | 2002 | TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY | $3,820 | $2,080 | Implemented |
IA0277 # 02 Y:2001 | 02 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,129 | $0 | Implemented |
IA0277 # 04 Y:2001 | 04 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,705 | $761 | Implemented |
IA0277 # 08 Y:2001 | 08 | 2001 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,004 | $5,000 | Implemented |
IA0277 # 09 Y:2001 | 09 | 2001 | REPAIR AND ELIMINATE STEAM LEAKS | $2,357 | $2,400 | Implemented |
LM0019 # 04 Y:2001 | 04 | 2001 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $3,087 | $450 | Implemented |
LM0019 # 05 Y:2001 | 05 | 2001 | OPTIMIZE LOT SIZES TO REDUCE INVENTORY CARRYING COSTS | $10,000 | $3,000 | Implemented |
UD0629 # 07 Y:2001 | 07 | 2001 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $3,907 | $0 | Implemented |
WV0218 # 02 Y:2001 | 02 | 2001 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $15,768 | $13,800 | Implemented |
WV0218 # 03 Y:2001 | 03 | 2001 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $1,519 | $1,362 | Implemented |
WV0218 # 04 Y:2001 | 04 | 2001 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $121 | $60 | Implemented |
WV0218 # 06 Y:2001 | 06 | 2001 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $5,713 | $1,440 | Implemented |
WV0218 # 07 Y:2001 | 07 | 2001 | INSULATE BARE EQUIPMENT | $1,985 | $276 | Implemented |