IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

738

matching recommendations
Reset
SIC 3069 Fabricated Rubber Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0456 # 10 Y:2012 10 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,050 $200 Implemented
WV0455 # 03 Y:2012 03 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,439 $5,745 Implemented
WV0455 # 04 Y:2012 04 2012 INSULATE BARE EQUIPMENT $6,023 $2,440 Implemented
WV0455 # 06 Y:2012 06 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,600 $3,294 Implemented
WV0455 # 09 Y:2012 09 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,863 $1,706 Implemented
WV0455 # 10 Y:2012 10 2012 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,663 $2,117 Implemented
WV0455 # 11 Y:2012 11 2012 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $1,644 $1,000 Implemented
WV0455 # 12 Y:2012 12 2012 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,418 $1,000 Implemented
WV0455 # 13 Y:2012 13 2012 DEVELOP A REPAIR/REPLACE POLICY $1,157 $841 Implemented
WV0455 # 15 Y:2012 15 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $845 $70 Implemented
WV0455 # 16 Y:2012 16 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $712 $620 Implemented
WV0455 # 17 Y:2012 17 2012 USE PHOTOCELL CONTROLS $645 $620 Implemented
WV0455 # 18 Y:2012 18 2012 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $377 $500 Implemented
UD0859 # 02 Y:2012 02 2012 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $581 $600 Implemented
UD0859 # 05 Y:2012 05 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,953 $1,000 Implemented
UD0859 # 06 Y:2012 06 2012 INSTALL / REPAIR INSULATION ON STEAM LINES $20,256 $6,033 Implemented
UD0859 # 07 Y:2012 07 2012 REDUCE EXCESS STEAM BLEEDING $20,148 $0 Implemented
UD0859 # 08 Y:2012 08 2012 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $14,768 $2,000 Implemented
NC0451 # 01 Y:2012 01 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,790 $14,320 Implemented
NC0451 # 02 Y:2012 02 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $444 $1,674 Implemented
NC0451 # 03 Y:2012 03 2012 INSTALL OCCUPANCY SENSORS $252 $533 Implemented
NC0451 # 05 Y:2012 05 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,516 $4,075 Implemented
NC0451 # 06 Y:2012 06 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $158 $100 Implemented
MI0205 # 05 Y:2011 05 2011 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $3,114 $2,500 Implemented
SF0390 # 01 Y:2010 01 2010 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,708 $0 Implemented