Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
120
matching recommendationsSIC | 3069 | Fabricated Rubber Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD1072 # 05 Y:2024 | 05 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,892 | $12,650 | Implemented |
UD1072 # 03 Y:2024 | 03 | 2024 | INSTALL / REPAIR INSULATION ON CONDENSATE LINES | $63 | $216 | Implemented |
UD1072 # 01 Y:2024 | 01 | 2024 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $5,741 | $5,000 | Implemented |
UD1072 # 02 Y:2024 | 02 | 2024 | INSTALL / REPAIR INSULATION ON STEAM LINES | $3,199 | $864 | Implemented |
WV0653 # 06 Y:2023 | 06 | 2023 | MINIMIZE WATER USAGE | $13,630 | $45,516 | Implemented |
WV0653 # 14 Y:2023 | 14 | 2023 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $3,320 | $1,500 | Implemented |
WV0653 # 13 Y:2023 | 13 | 2023 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,757 | $1,288 | Implemented |
WV0653 # 07 Y:2023 | 07 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,961 | $800 | Implemented |
WV0653 # 16 Y:2023 | 16 | 2023 | INSULATE BARE EQUIPMENT | $1,621 | $787 | Implemented |
WV0653 # 04 Y:2023 | 04 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $33,555 | $52,800 | Implemented |
WV0653 # 03 Y:2023 | 03 | 2023 | UPGRADE CONTROLS ON COMPRESSORS | $38,158 | $64,250 | Implemented |
WV0653 # 15 Y:2023 | 15 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,200 | $3,036 | Implemented |
WV0653 # 11 Y:2023 | 11 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,758 | $2,675 | Implemented |
WV0653 # 10 Y:2023 | 10 | 2023 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $5,884 | $14,800 | Implemented |
WV0653 # 08 Y:2023 | 08 | 2023 | DEVELOP A REPAIR/REPLACE POLICY | $10,683 | $9,567 | Implemented |
WV0585 # 07 Y:2019 | 07 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,160 | $1,100 | Implemented |
WV0585 # 10 Y:2019 | 10 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,014 | $1,303 | Implemented |
WV0585 # 08 Y:2019 | 08 | 2019 | DEVELOP A REPAIR/REPLACE POLICY | $5,125 | $1,450 | Implemented |
WV0585 # 06 Y:2019 | 06 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,658 | $9,998 | Implemented |
WV0585 # 05 Y:2019 | 05 | 2019 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $9,261 | $0 | Implemented |
UD0994 # 04 Y:2019 | 04 | 2019 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $248,034 | $337,264 | Implemented |
WV0532 # 04 Y:2016 | 04 | 2016 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $5,128 | $0 | Implemented |
WV0532 # 11 Y:2016 | 11 | 2016 | INSTALL OCCUPANCY SENSORS | $796 | $795 | Implemented |
WV0532 # 06 Y:2016 | 06 | 2016 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,845 | $2,675 | Implemented |
WV0532 # 13 Y:2016 | 13 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $145 | $25 | Implemented |