IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

28

matching recommendations
Reset
SIC 3069 Fabricated Rubber Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ND0348 # 04 Y:2000 04 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $268 $200 Implemented
ND0348 # 02 Y:2000 02 2000 INSULATE BARE EQUIPMENT $271 $925 Implemented
ND0348 # 01 Y:2000 01 2000 REPLACE BOILER $4,017 $10,000 Implemented
ND0348 # 06 Y:2000 06 2000 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $433 $400 Implemented
ND0348 # 05 Y:2000 05 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $524 $385 Implemented
ND0338 # 06 Y:1999 06 1999 TURN OFF EQUIPMENT WHEN NOT IN USE $60 $87 Implemented
ND0338 # 04 Y:1999 04 1999 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $318 $272 Implemented
ND0338 # 02 Y:1999 02 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $289 $480 Implemented
ND0338 # 01 Y:1999 01 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $278 $120 Implemented
ND0333 # 08 Y:1999 08 1999 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $1,192 $3,600 Implemented
ND0333 # 09 Y:1999 09 1999 $11,110 $30,000 Implemented
ND0333 # 07 Y:1999 07 1999 USE EVAPORATION TO CONCENTRATE MATERIAL $12,426 $15,500 Implemented
ND0333 # 06 Y:1999 06 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $212 $480 Implemented
ND0333 # 05 Y:1999 05 1999 DEVELOP A REPAIR/REPLACE POLICY $8,764 $7,291 Implemented
ND0333 # 02 Y:1999 02 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $855 $220 Implemented
ND0334 # 01 Y:1999 01 1999 $4,400 $250 Implemented
ND0334 # 02 Y:1999 02 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $358 $560 Implemented
ND0334 # 03 Y:1999 03 1999 $22,061 $57,704 Implemented
ND0334 # 10 Y:1999 10 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $807 $200 Implemented
ND0182 # 01 Y:1994 01 1994 REDUCE SOLUTION DRAG-OUT TO PREVENT SOLUTION LOSS $95,000 $500 Implemented
ND0183 # 05 Y:1994 05 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,708 $200 Implemented
ND0183 # 03 Y:1994 03 1994 OPTIMIZE PLANT POWER FACTOR $17,887 $18,770 Implemented
ND0182 # 09 Y:1994 09 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,598 $2,403 Implemented
ND0182 # 08 Y:1994 08 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,800 $320 Implemented
ND0182 # 05 Y:1994 05 1994 OPTIMIZE PLANT POWER FACTOR $17,888 $18,771 Implemented