Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
6,095
matching recommendationsSIC | 308 | Miscellaneous Plastics Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0110 # 09 Y:1997 | 09 | 1997 | DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS | $15,090 | $0 | Implemented |
MA0382 # 01 Y:1997 | 01 | 1997 | INSULATE BARE EQUIPMENT | $1,954 | $1,527 | Implemented |
MA0382 # 02 Y:1997 | 02 | 1997 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $2,296 | $5,000 | Implemented |
MA0382 # 06 Y:1997 | 06 | 1997 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,713 | $200 | Implemented |
SD0164 # 01 Y:1997 | 01 | 1997 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $50,256 | $53,800 | Implemented |
SD0164 # 02 Y:1997 | 02 | 1997 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $241,567 | $538,000 | Implemented |
SD0164 # 04 Y:1997 | 04 | 1997 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $17,052 | $9,016 | Implemented |
SD0164 # 05 Y:1997 | 05 | 1997 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $9,242 | $1,500 | Implemented |
SD0164 # 06 Y:1997 | 06 | 1997 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $704 | $0 | Implemented |
SD0164 # 09 Y:1997 | 09 | 1997 | INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE | $11,250 | $0 | Implemented |
SD0164 # 10 Y:1997 | 10 | 1997 | INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE | $10,000 | $0 | Implemented |
SD0164 # 11 Y:1997 | 11 | 1997 | INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE | $6,000 | $0 | Implemented |
SD0164 # 12 Y:1997 | 12 | 1997 | CONVERT TO LESS TOXIC HYDROCARBON CLEANERS | $496 | $0 | Implemented |
SD0164 # 13 Y:1997 | 13 | 1997 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $164,025 | $20,000 | Implemented |
SD0164 # 14 Y:1997 | 14 | 1997 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $29,160 | $1,000 | Implemented |
SD0164 # 15 Y:1997 | 15 | 1997 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $36,450 | $8,000 | Implemented |
SD0163 # 01 Y:1997 | 01 | 1997 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $18,513 | $12,290 | Implemented |
SD0163 # 02 Y:1997 | 02 | 1997 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $28,303 | $0 | Implemented |
SD0163 # 03 Y:1997 | 03 | 1997 | REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH | $27,336 | $4,000 | Implemented |
SD0163 # 04 Y:1997 | 04 | 1997 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $17,545 | $38,000 | Implemented |
SD0163 # 05 Y:1997 | 05 | 1997 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $11,307 | $1,800 | Implemented |
SD0163 # 06 Y:1997 | 06 | 1997 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $9,941 | $9,500 | Implemented |
SD0163 # 07 Y:1997 | 07 | 1997 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $3,325 | $1,127 | Implemented |
SD0163 # 08 Y:1997 | 08 | 1997 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,455 | $1,250 | Implemented |
SD0163 # 10 Y:1997 | 10 | 1997 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $77,729 | $211,365 | Implemented |