Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
44
matching recommendationsSIC | 308 | Miscellaneous Plastics Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IA0329 # 05 Y:2003 | 05 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $797 | $1,198 | Implemented |
IA0329 # 07 Y:2003 | 07 | 2003 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $23 | $42 | Implemented |
IA0329 # 03 Y:2003 | 03 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,437 | $22 | Implemented |
IA0329 # 02 Y:2003 | 02 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,024 | $250 | Implemented |
IA0329 # 01 Y:2003 | 01 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,170 | $533 | Implemented |
IA0308 # 09 Y:2002 | 09 | 2002 | ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL | $13,000 | $17,850 | Implemented |
IA0308 # 03 Y:2002 | 03 | 2002 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,472 | $253 | Implemented |
IA0308 # 01 Y:2002 | 01 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,148 | $409 | Implemented |
IA0304 # 10 Y:2002 | 10 | 2002 | INSTALL SET-BACK TIMERS | $101 | $197 | Implemented |
IA0304 # 12 Y:2002 | 12 | 2002 | INSULATE BARE EQUIPMENT | $85 | $180 | Implemented |
IA0304 # 09 Y:2002 | 09 | 2002 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,426 | $0 | Implemented |
IA0304 # 08 Y:2002 | 08 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,112 | $11,834 | Implemented |
IA0304 # 03 Y:2002 | 03 | 2002 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $114 | $17 | Implemented |
IA0304 # 01 Y:2002 | 01 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,847 | $866 | Implemented |
DS0175 # 04 Y:2000 | 04 | 2000 | INSTALL TIMERS AND/OR THERMOSTATS | $2,005 | $330 | Implemented |
DS0175 # 03 Y:2000 | 03 | 2000 | OPTIMIZE PLANT POWER FACTOR | $1,540 | $2,100 | Implemented |
IA0245 # 04 Y:2000 | 04 | 2000 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $186 | $25 | Implemented |
IA0245 # 07 Y:2000 | 07 | 2000 | REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS | $97,398 | $100,000 | Implemented |
IA0245 # 06 Y:2000 | 06 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $114 | $113 | Implemented |
IA0245 # 03 Y:2000 | 03 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $791 | $0 | Implemented |
DS0140 # 01 Y:1999 | 01 | 1999 | OPTIMIZE PLANT POWER FACTOR | $1,918 | $1,190 | Implemented |
DS0140 # 04 Y:1999 | 04 | 1999 | RECOVER AND REUSE WASTE MATERIAL | $641 | $60 | Implemented |
DS0140 # 07 Y:1999 | 07 | 1999 | PAY BILLS ON TIME TO AVOID LATE FEES | $70 | $0 | Implemented |
DS0139 # 06 Y:1999 | 06 | 1999 | INSTALL SHELVES / RACKS TO UTILIZE UNUSED SPACE | $2,633 | $7,000 | Implemented |
DS0139 # 02 Y:1999 | 02 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $882 | $500 | Implemented |