IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

384

matching recommendations
Reset
SIC 3081 Unsupported Plastics Film & Sheet
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0345 # 05 Y:2004 05 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,230 $1,650 Implemented
LL0193 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $118,511 $3,400 Implemented
LL0193 # 02 Y:2004 02 2004 OPTIMIZE PLANT POWER FACTOR $16,033 $25,871 Implemented
LL0193 # 04 Y:2004 04 2004 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $4,526 $390 Implemented
LL0193 # 05 Y:2004 05 2004 INSTALL OCCUPANCY SENSORS $195 $135 Implemented
LL0193 # 06 Y:2004 06 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $468 $350 Implemented
LL0193 # 07 Y:2004 07 2004 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $4,980 $1,684 Implemented
UF0344 # 03 Y:2004 03 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,950 $490 Implemented
BD0248 # 03 Y:2003 03 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $11,140 $23,175 Implemented
BD0248 # 04 Y:2003 04 2003 USE RADIANT HEATER FOR SPOT HEATING $4,072 $5,000 Implemented
BD0248 # 05 Y:2003 05 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,847 $4,555 Implemented
BD0248 # 06 Y:2003 06 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,760 $1,000 Implemented
BD0248 # 08 Y:2003 08 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,492 $0 Implemented
BD0248 # 10 Y:2003 10 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $663 $600 Implemented
BD0248 # 11 Y:2003 11 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $439 $175 Implemented
BD0248 # 15 Y:2003 15 2003 INSTALL EQUIPMENT TO MOVE PRODUCT $28,938 $3,000 Implemented
NC0269 # 01 Y:2003 01 2003 INSTALL REFRIGERATION SYSTEM TO COOL PRODUCT $272,200 $118,250 Implemented
NC0269 # 02 Y:2003 02 2003 INSULATE BARE EQUIPMENT $16,965 $5,128 Implemented
NC0269 # 03 Y:2003 03 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $14,974 $9,174 Implemented
NC0269 # 04 Y:2003 04 2003 DEVELOP A REPAIR/REPLACE POLICY $4,027 $1,719 Implemented
NC0269 # 06 Y:2003 06 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,654 $2,400 Implemented
BD0247 # 02 Y:2003 02 2003 RECOVER WASTE HEAT FROM EQUIPMENT $13,627 $1,000 Implemented
BD0247 # 03 Y:2003 03 2003 INSULATE BARE EQUIPMENT $13,156 $8,080 Implemented
BD0247 # 04 Y:2003 04 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $8,345 $35,510 Implemented
BD0247 # 05 Y:2003 05 2003 USE RADIANT HEATER FOR SPOT HEATING $7,407 $8,000 Implemented