Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
932
matching recommendationsSIC | 3081 | Unsupported Plastics Film & Sheet |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AM0433 # 07 Y:2003 | 07 | 2003 | PAY BILLS ON TIME TO AVOID LATE FEES | $130 | $0 | Implemented |
LM0034 # 01 Y:2002 | 01 | 2002 | INSTALL SPECTRAL REFLECTORS / DELAMP | $20,645 | $300 | Implemented |
LM0034 # 02 Y:2002 | 02 | 2002 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $6,353 | $1,480 | Not Implemented |
LM0034 # 03 Y:2002 | 03 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,937 | $200 | Not Implemented |
LM0034 # 04 Y:2002 | 04 | 2002 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,911 | $0 | Implemented |
LM0034 # 05 Y:2002 | 05 | 2002 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,006 | $2,640 | Implemented |
LM0034 # 06 Y:2002 | 06 | 2002 | USE OPTIMUM THICKNESS INSULATION | $6,347 | $900 | Not Implemented |
MA0506 # 01 Y:2002 | 01 | 2002 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,554 | $9,225 | Implemented |
MA0506 # 02 Y:2002 | 02 | 2002 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $5,604 | $13,500 | Not Implemented |
MA0506 # 03 Y:2002 | 03 | 2002 | INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION | $3,778 | $0 | Not Implemented |
MA0506 # 04 Y:2002 | 04 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,391 | $1,102 | Implemented |
MA0506 # 05 Y:2002 | 05 | 2002 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,289 | $1,100 | Implemented |
MA0506 # 06 Y:2002 | 06 | 2002 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $982 | $3,275 | Implemented |
IA0254 # 01 Y:2000 | 01 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,605 | $18,341 | Not Implemented |
IA0254 # 02 Y:2000 | 02 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,391 | $0 | Not Implemented |
IA0254 # 03 Y:2000 | 03 | 2000 | INSTALL OCCUPANCY SENSORS | $146 | $665 | Not Implemented |
IA0254 # 04 Y:2000 | 04 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,021 | $163 | Not Implemented |
IA0254 # 05 Y:2000 | 05 | 2000 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,385 | $170 | Not Implemented |
IA0254 # 06 Y:2000 | 06 | 2000 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $977 | $32 | Not Implemented |
IA0254 # 07 Y:2000 | 07 | 2000 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $316 | $78 | Not Implemented |
IA0254 # 08 Y:2000 | 08 | 2000 | ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL | $34,944 | $38,000 | Not Implemented |
TN0676 # 01 Y:2000 | 01 | 2000 | TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY | $105,000 | $94,080 | Not Implemented |
TN0676 # 02 Y:2000 | 02 | 2000 | DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS | $37,314 | $28,050 | Not Implemented |
TN0676 # 03 Y:2000 | 03 | 2000 | MINIMIZE CONDENSER COOLING WATER TEMPERATURE | $6,275 | $18,200 | Implemented |
TN0676 # 04 Y:2000 | 04 | 2000 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $6,144 | $1,200 | Not Implemented |