IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

429

matching recommendations
Reset
SIC 3086 Plastics Foam Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WM0029 # 02 Y:2013 02 2013 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,542 $1,240 Implemented
WM0029 # 05 Y:2013 05 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $9,925 $4,915 Implemented
WM0029 # 10 Y:2013 10 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,633 $644 Implemented
MZ0108 # 09 Y:2013 09 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $119 $32 Implemented
MZ0108 # 06 Y:2013 06 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,354 $1,090 Implemented
SD0467 # 08 Y:2013 08 2013 USE PHOTOCELL CONTROLS $1,846 $2,628 Implemented
SD0467 # 06 Y:2013 06 2013 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,309 $200 Implemented
SD0467 # 05 Y:2013 05 2013 REPAIR AND ELIMINATE STEAM LEAKS $2,867 $200 Implemented
SD0467 # 03 Y:2013 03 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,612 $500 Implemented
SD0467 # 02 Y:2013 02 2013 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $7,483 $12,710 Implemented
SD0467 # 01 Y:2013 01 2013 REDUCE SCRAP PRODUCTION $24,055 $56,924 Implemented
SF0425 # 08 Y:2013 08 2013 HEAT WATER DURING OFF-PEAK PERIODS AND STORE FOR LATER USE $692 $2,830 Implemented
SF0425 # 07 Y:2013 07 2013 INSTALL OCCUPANCY SENSORS $3,416 $13,849 Implemented
SF0425 # 06 Y:2013 06 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,808 $7,235 Implemented
SF0425 # 02 Y:2013 02 2013 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $15,421 $7,471 Implemented
SF0425 # 01 Y:2013 01 2013 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $6,713 $0 Implemented
MA0703 # 01 Y:2012 01 2012 OPTIMIZE PLANT POWER FACTOR $10,588 $9,425 Implemented
MA0703 # 07 Y:2012 07 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,254 $100 Implemented
MA0703 # 09 Y:2012 09 2012 TURN OFF STEAM / HOT WATER LINES LEADING TO SPACE HEATING UNITS $332 $150 Implemented
NC0428 # 08 Y:2011 08 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $681 $100 Implemented
NC0428 # 07 Y:2011 07 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,910 $25 Implemented
NC0428 # 05 Y:2011 05 2011 INSTALL OCCUPANCY SENSORS $307 $750 Implemented
NC0428 # 04 Y:2011 04 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,540 $13,050 Implemented
NC0428 # 03 Y:2011 03 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $72,294 $287,294 Implemented
NC0428 # 01 Y:2011 01 2011 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $145,527 $450,915 Implemented