IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

35

matching recommendations
Reset
SIC 3088 Plastics Plumbing Fixtures
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0361 # 04 Y:2005 04 2005 INSTALL OCCUPANCY SENSORS $390 $170 Implemented
SD0361 # 03 Y:2005 03 2005 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,916 $144 Implemented
SD0361 # 02 Y:2005 02 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,570 $280 Implemented
SD0358 # 08 Y:2005 08 2005 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE $37,125 $52,500 Implemented
SD0358 # 06 Y:2005 06 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,023 $37,287 Implemented
SD0358 # 05 Y:2005 05 2005 REPAIR AND ELIMINATE STEAM LEAKS $550 $1,050 Implemented
SD0358 # 02 Y:2005 02 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,194 $360 Implemented
SD0357 # 05 Y:2005 05 2005 AUTOMATE FINISHING PROCESS $189,416 $450,000 Implemented
SD0357 # 01 Y:2005 01 2005 RECOVER WASTE HEAT FROM EQUIPMENT $416,473 $750,000 Implemented
SD0357 # 06 Y:2005 06 2005 INSTALL SYSTEM TO COLLECT SCRAP $32,128 $29,639 Implemented
SD0263 # 09 Y:2001 09 2001 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $9,500 $7,000 Implemented
SD0263 # 07 Y:2001 07 2001 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES $4,278 $0 Implemented
SD0263 # 05 Y:2001 05 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,644 $9,576 Implemented
SD0263 # 04 Y:2001 04 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,402 $90 Implemented
SD0263 # 03 Y:2001 03 2001 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $3,173 $4,000 Implemented
SD0263 # 02 Y:2001 02 2001 TURN OFF EQUIPMENT WHEN NOT IN USE $1,258 $1,500 Implemented
SD0117 # 09 Y:1995 09 1995 RECYCLE CLEANING SOLVENT AND REUSE $14,753 $10,000 Implemented
SD0117 # 10 Y:1995 10 1995 USE A DIFFERENT OR RECYCLED RAW MATERIAL $180 $0 Implemented
SD0117 # 08 Y:1995 08 1995 USE PHOTOCELL CONTROLS $1,578 $560 Implemented
SD0117 # 01 Y:1995 01 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,630 $2,690 Implemented
SD0117 # 02 Y:1995 02 1995 INSULATE BARE EQUIPMENT $4,498 $630 Implemented
SD0117 # 03 Y:1995 03 1995 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,318 $20 Implemented
SD0117 # 04 Y:1995 04 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,895 $400 Implemented
SD0117 # 05 Y:1995 05 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,676 $10,950 Implemented
SD0117 # 06 Y:1995 06 1995 INSTALL SPECTRAL REFLECTORS / DELAMP $5,389 $6,575 Implemented