Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,860
matching recommendationsSIC | 3089 | Plastics Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LE0444 # 11 Y:2017 | 11 | 2017 | CONSIDER POWER LOSS AS WELL AS INITIAL LOADS AND LOAD GROWTH IN DOWN-SIZING TRANSFORMERS | $233,480 | $1,905,000 | Implemented |
MI0323 # 01 Y:2017 | 01 | 2017 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $19,478 | $51,292 | Implemented |
MI0323 # 02 Y:2017 | 02 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,440 | $49,900 | Implemented |
MI0323 # 03 Y:2017 | 03 | 2017 | TURN OFF EQUIPMENT WHEN NOT IN USE | $8,856 | $2,800 | Implemented |
MI0323 # 06 Y:2017 | 06 | 2017 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $6,290 | $7,150 | Implemented |
MI0323 # 07 Y:2017 | 07 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,380 | $1,660 | Implemented |
MI0323 # 08 Y:2017 | 08 | 2017 | USE SOLAR HEAT TO HEAT WATER | $1,635 | $1,500 | Implemented |
SU0451 # 01 Y:2017 | 01 | 2017 | PAY BILLS ON TIME TO AVOID LATE FEES | $2,840 | $0 | Implemented |
SU0451 # 03 Y:2017 | 03 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $841 | $0 | Implemented |
SU0451 # 04 Y:2017 | 04 | 2017 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $190 | $0 | Implemented |
SU0451 # 05 Y:2017 | 05 | 2017 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $250 | $49 | Implemented |
SU0451 # 06 Y:2017 | 06 | 2017 | REDUCE VENTILATION AIR | $3,564 | $915 | Implemented |
SU0451 # 07 Y:2017 | 07 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,072 | $4,959 | Implemented |
SU0451 # 08 Y:2017 | 08 | 2017 | ELIMINATE/REDUCE AN OPERATION | $3,150 | $2,940 | Implemented |
SU0451 # 10 Y:2017 | 10 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $216 | $305 | Implemented |
SU0451 # 11 Y:2017 | 11 | 2017 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $249 | $399 | Implemented |
SU0451 # 12 Y:2017 | 12 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $859 | $1,749 | Implemented |
IP0090 # 01 Y:2017 | 01 | 2017 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $1,309 | $0 | Implemented |
IP0090 # 02 Y:2017 | 02 | 2017 | DO NOT USE COMPRESSED AIR FOR PERSONAL COOLING | $3,956 | $110 | Implemented |
IP0090 # 03 Y:2017 | 03 | 2017 | COVER OPEN TANKS | $12,129 | $1,104 | Implemented |
IP0090 # 04 Y:2017 | 04 | 2017 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $7,344 | $1,170 | Implemented |
IP0090 # 05 Y:2017 | 05 | 2017 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $12,525 | $2,345 | Implemented |
IP0090 # 06 Y:2017 | 06 | 2017 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $4,535 | $1,350 | Implemented |
IP0090 # 08 Y:2017 | 08 | 2017 | INSTALL OCCUPANCY SENSORS | $2,178 | $2,494 | Implemented |
IP0090 # 09 Y:2017 | 09 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,026 | $8,813 | Implemented |