IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,878

matching recommendations
Reset
SIC 3089 Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0488 # 10 Y:2014 10 2014 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $444 $320 Implemented
WV0488 # 11 Y:2014 11 2014 DEVELOP A REPAIR/REPLACE POLICY $327 $221 Implemented
BD0444 # 04 Y:2014 04 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,722 $300 Implemented
WM0046 # 01 Y:2014 01 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $266 $132 Implemented
WM0046 # 02 Y:2014 02 2014 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $394 $320 Implemented
WM0046 # 03 Y:2014 03 2014 IMPROVE SPACE COMFORT CONDITIONING $5,525 $595 Implemented
BD0443 # 02 Y:2014 02 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $17,592 $225 Implemented
BD0443 # 03 Y:2014 03 2014 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $11,323 $11,250 Implemented
BD0443 # 09 Y:2014 09 2014 SHUT OFF PILOTS IN STANDBY EQUIPMENT $175 $40 Implemented
SF0447 # 02 Y:2014 02 2014 TURN OFF EQUIPMENT WHEN NOT IN USE $4,248 $0 Implemented
SF0447 # 03 Y:2014 03 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,366 $4,235 Implemented
IP0024 # 01 Y:2014 01 2014 INSULATE BARE EQUIPMENT $16,250 $0 Implemented
IP0024 # 02 Y:2014 02 2014 APPLY FOR INVESTMENT INCENTIVES $2,460 $147 Implemented
WM0044 # 01 Y:2014 01 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $620 $487 Implemented
WM0044 # 03 Y:2014 03 2014 CONTRACT A WOOD PALLET RECYCLING COMPANY $1,297 $0 Implemented
WM0044 # 04 Y:2014 04 2014 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $4,078 $5,000 Implemented
WM0044 # 05 Y:2014 05 2014 USE SYNTHETIC LUBRICANT $3,359 $1,269 Implemented
WM0044 # 06 Y:2014 06 2014 RECOVER WASTE HEAT FROM EQUIPMENT $323 $345 Implemented
WM0044 # 08 Y:2014 08 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $992 $2,434 Implemented
UA0118 # 02 Y:2014 02 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $57,584 $9,695 Implemented
UA0118 # 05 Y:2014 05 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,871 $70,925 Implemented
UA0118 # 06 Y:2014 06 2014 INSTALL OCCUPANCY SENSORS $10,122 $8,800 Implemented
IA0515 # 01 Y:2014 01 2014 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $21,416 $3,325 Implemented
IA0515 # 02 Y:2014 02 2014 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $4,176 $380 Implemented
IA0515 # 03 Y:2014 03 2014 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,894 $14,469 Implemented