IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

107

matching recommendations
Reset
SIC 3089 Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0963 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $19,639 $1,850 Implemented
GT0963 # 03 Y:2023 03 2023 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $725 $450 Implemented
GT0912 # 02 Y:2018 02 2018 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $8,530 $142 Implemented
GT0912 # 06 Y:2018 06 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,774 $17,795 Implemented
GT0912 # 03 Y:2018 03 2018 INSULATE BARE EQUIPMENT $39,033 $804 Implemented
GT0912 # 01 Y:2018 01 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,273 $150 Implemented
GT0909 # 05 Y:2017 05 2017 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $49,838 $321,120 Implemented
GT0909 # 03 Y:2017 03 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $49,255 $36,180 Implemented
GT0885 # 07 Y:2011 07 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,257 $12,880 Implemented
GT0885 # 03 Y:2011 03 2011 USE PHOTOCELL CONTROLS $197 $285 Implemented
GT0885 # 01 Y:2011 01 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,060 $2,500 Implemented
GT0885 # 08 Y:2011 08 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,494 $14,600 Implemented
UF0393 # 09 Y:2006 09 2006 TURN OFF EQUIPMENT WHEN NOT IN USE $643 $0 Implemented
UF0393 # 06 Y:2006 06 2006 INSTALL OCCUPANCY SENSORS $1,990 $227 Implemented
GT0797 # 03 Y:2005 03 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $121,511 $243,073 Implemented
GT0797 # 06 Y:2005 06 2005 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $7,716 $400 Implemented
GT0797 # 05 Y:2005 05 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,100 $500 Implemented
GT0797 # 01 Y:2005 01 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,893 $3,800 Implemented
GT0797 # 07 Y:2005 07 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,447 $3,692 Implemented
GT0797 # 02 Y:2005 02 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $22,440 $1,500 Implemented
GT0781 # 03 Y:2004 03 2004 DISCONNECT BALLASTS $4,110 $2,750 Implemented
GT0781 # 01 Y:2004 01 2004 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $77 $0 Implemented
GT0781 # 08 Y:2004 08 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,408 $7,300 Implemented
GT0781 # 05 Y:2004 05 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $740 $1,000 Implemented
GT0781 # 02 Y:2004 02 2004 USE POWER DURING OFF-PEAK PERIODS $580 $450 Implemented