Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
990
matching recommendationsSIC | 3089 | Plastics Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0627 # 09 Y:2001 | 09 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $427 | $1,473 | n/a |
UD0627 # 10 Y:2001 | 10 | 2001 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $251 | $722 | n/a |
UD0627 # 11 Y:2001 | 11 | 2001 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $151 | $161 | n/a |
UD0625 # 01 Y:2001 | 01 | 2001 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $22,708 | $55,000 | Implemented |
UD0625 # 02 Y:2001 | 02 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,972 | $315 | Implemented |
UD0625 # 03 Y:2001 | 03 | 2001 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $10,095 | $4,500 | Implemented |
UD0625 # 04 Y:2001 | 04 | 2001 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,767 | $13,700 | Not Implemented |
UD0625 # 05 Y:2001 | 05 | 2001 | INSULATE BARE EQUIPMENT | $5,466 | $2,880 | Implemented |
UD0625 # 06 Y:2001 | 06 | 2001 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $3,363 | $100 | Not Implemented |
UD0625 # 07 Y:2001 | 07 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,047 | $3,000 | Not Implemented |
UD0625 # 08 Y:2001 | 08 | 2001 | REPROCESS SPENT OILS ON SITE FOR RE-USE | $835 | $3,323 | Implemented |
UD0611 # 01 Y:2001 | 01 | 2001 | REDUCE SCRAP PRODUCTION | $171,908 | $100,000 | Not Implemented |
UD0611 # 02 Y:2001 | 02 | 2001 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $120,000 | $95,750 | Not Implemented |
UD0611 # 03 Y:2001 | 03 | 2001 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $29,561 | $1,200 | Implemented |
UD0611 # 04 Y:2001 | 04 | 2001 | UPGRADE CONTROLS ON COMPRESSORS | $23,249 | $4,000 | Implemented |
UD0611 # 05 Y:2001 | 05 | 2001 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $17,705 | $3,000 | Implemented |
UD0611 # 06 Y:2001 | 06 | 2001 | TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY | $12,096 | $0 | Not Implemented |
UD0611 # 07 Y:2001 | 07 | 2001 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $6,016 | $0 | Implemented |
UD0611 # 08 Y:2001 | 08 | 2001 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,371 | $1,000 | Implemented |
UD0611 # 09 Y:2001 | 09 | 2001 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $2,773 | $700 | Implemented |
UD0611 # 10 Y:2001 | 10 | 2001 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,345 | $500 | Not Implemented |
UD0605 # 01 Y:2000 | 01 | 2000 | EMPLOY MODULAR JIGS TO REDUCE PROCESS SET-UP TIME | $22,080 | $4,000 | Not Implemented |
UD0605 # 02 Y:2000 | 02 | 2000 | REPROCESS SPENT OILS ON SITE FOR RE-USE | $7,605 | $4,200 | Implemented |
UD0605 # 03 Y:2000 | 03 | 2000 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $4,735 | $0 | Implemented |
UD0602 # 01 Y:2000 | 01 | 2000 | DEVELOP STANDARD OPERATING PROCEDURES | $643,500 | $150,000 | Implemented |